Tender Details

Particulars Details
Title
Construction Of Foundation Of Tugger Haulage At 21 L 23 Wd Proposed 29 L 23 Wd Proposed 29 L 15 Wd Cleaning And Loading In Tub Of Carbonaceous Materials Shale And Stone From 21 L 23 Wd To 24 L 23 Wd And Roof Bolting From 21 L 23 Wd To 25 L 23 Wd 24 L 22 Wd To 25 L
Description
Construction Of Foundation Of Tugger Haulage At 21 L 23 Wd Proposed 29 L 23 Wd Proposed 29 L 15 Wd Cleaning And Loading In Tub Of Carbonaceous Materials Shale And Stone From 21 L 23 Wd To 24 L 23 Wd And Roof Bolting From 21 L 23 Wd To 25 L 23 Wd 24 L 22 Wd To 25 L
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_344135_1
Reference
Number
SS/GM/AMPCD/25-26/FTH/BHWBC/26 Date-15.09.2025
Tender Fee 0
EMD 6200
Tender Value -
Place Bhanora West Block Colliery, Satgram-Sripur Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=356737

Start Date September 18, 2025 16:30
End Date
Expired 24/09/2025

Expired 344 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Foundation of tugger haulage at 10 west dip in between 20l and 21l along cleaning carbonaceous materials shale and stone and roof bolting in r-vi seam 22l-10wd to 24l-10wd bhanora west block colliery

Foundation of tugger haulage at 10 west dip in between 20l and 21l along cleaning carbonaceous materials shale and stone and roof bolting in r-vi seam 22l-10wd to 24l-10wd bhanora west block colliery

Read more
Construction of new 5 nos ventilation stopping in sripur r-vi seam from 21l in between 23wd 24wd 22l in between 23 wd and 24 wd 23l in between 23 wd and 24 wd in between 23l 24l 23wd and 23l 24l 22wd for provision of maintaining adequate vent

Construction of new 5 nos ventilation stopping in sripur r-vi seam from 21l in between 23wd 24wd 22l in between 23 wd and 24 wd 23l in between 23 wd and 24 wd in between 23l 24l 23wd and 23l 24l 22wd for provision of maintaining adequate vent

Read more
Foundation of tugger haulage at 14wd between 21l and 22l along cleaning carbonaceous materials shale and stone and roof bolting in r vi seam 22l 14wd dip to 25l 14wd dip for smooth running of tugger haulage as the mines having grant i in 6 5

Foundation of tugger haulage at 14wd between 21l and 22l along cleaning carbonaceous materials shale and stone and roof bolting in r vi seam 22l 14wd dip to 25l 14wd dip for smooth running of tugger haulage as the mines having grant i in 6 5

Read more
Heightening of drift 26d/25l, 26d/39l and removal of coal shale from 26d/25l drift in underground gallery (including transpor-tation) for preparation of proposed belt in-stallation in 26d/25l drift of lws.

Heightening of drift 26d/25l, 26d/39l and removal of coal shale from 26d/25l drift in underground gallery (including transpor-tation) for preparation of proposed belt in-stallation in 26d/25l drift of lws.

Read more
Cleaning of blasted carbonaceous materials and fallen materials mixed with shale for establishment of stowing pipe line and drainage of stowing water in proposed dep. with stowing panel s-1 and loading into tubs in narsamuda(r-x) seam workings at nar

Cleaning of blasted carbonaceous materials and fallen materials mixed with shale for establishment of stowing pipe line and drainage of stowing water in proposed dep. with stowing panel s-1 and loading into tubs in narsamuda(r-x) seam workings at nar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise