Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Foundation Of Tugger Haulage At 21 L 23 Wd Proposed 29 L 23 Wd Proposed 29 L 15 Wd Cleaning And Loading In Tub Of Carbonaceous Materials Shale And Stone From 21 L 23 Wd To 24 L 23 Wd And Roof Bolting From 21 L 23 Wd To 25 L 23 Wd 24 L 22 Wd To 25 L
|
| Description |
Construction Of Foundation Of Tugger Haulage At 21 L 23 Wd Proposed 29 L 23 Wd Proposed 29 L 15 Wd Cleaning And Loading In Tub Of Carbonaceous Materials Shale And Stone From 21 L 23 Wd To 24 L 23 Wd And Roof Bolting From 21 L 23 Wd To 25 L 23 Wd 24 L 22 Wd To 25 L
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_344135_1 |
|
Reference Number |
SS/GM/AMPCD/25-26/FTH/BHWBC/26 Date-15.09.2025 |
| Tender Fee | 0 |
| EMD | 6200 |
| Tender Value | - |
| Place | Bhanora West Block Colliery, Satgram-Sripur Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=356737 |
| Start Date | September 18, 2025 16:30 |
| End Date |
Expired
24/09/2025
Expired 344 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Foundation of tugger haulage at 10 west dip in between 20l and 21l along cleaning carbonaceous materials shale and stone and roof bolting in r-vi seam 22l-10wd to 24l-10wd bhanora west block colliery
Foundation of tugger haulage at 10 west dip in between 20l and 21l along cleaning carbonaceous materials shale and stone and roof bolting in r-vi seam 22l-10wd to 24l-10wd bhanora west block colliery
Read moreConstruction of new 5 nos ventilation stopping in sripur r-vi seam from 21l in between 23wd 24wd 22l in between 23 wd and 24 wd 23l in between 23 wd and 24 wd in between 23l 24l 23wd and 23l 24l 22wd for provision of maintaining adequate vent
Construction of new 5 nos ventilation stopping in sripur r-vi seam from 21l in between 23wd 24wd 22l in between 23 wd and 24 wd 23l in between 23 wd and 24 wd in between 23l 24l 23wd and 23l 24l 22wd for provision of maintaining adequate vent
Read moreFoundation of tugger haulage at 14wd between 21l and 22l along cleaning carbonaceous materials shale and stone and roof bolting in r vi seam 22l 14wd dip to 25l 14wd dip for smooth running of tugger haulage as the mines having grant i in 6 5
Foundation of tugger haulage at 14wd between 21l and 22l along cleaning carbonaceous materials shale and stone and roof bolting in r vi seam 22l 14wd dip to 25l 14wd dip for smooth running of tugger haulage as the mines having grant i in 6 5
Read moreHeightening of drift 26d/25l, 26d/39l and removal of coal shale from 26d/25l drift in underground gallery (including transpor-tation) for preparation of proposed belt in-stallation in 26d/25l drift of lws.
Heightening of drift 26d/25l, 26d/39l and removal of coal shale from 26d/25l drift in underground gallery (including transpor-tation) for preparation of proposed belt in-stallation in 26d/25l drift of lws.
Read moreCleaning of blasted carbonaceous materials and fallen materials mixed with shale for establishment of stowing pipe line and drainage of stowing water in proposed dep. with stowing panel s-1 and loading into tubs in narsamuda(r-x) seam workings at nar
Cleaning of blasted carbonaceous materials and fallen materials mixed with shale for establishment of stowing pipe line and drainage of stowing water in proposed dep. with stowing panel s-1 and loading into tubs in narsamuda(r-x) seam workings at nar
Read moreof your Industry type