Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Installation Of Frp Huts At Thakung Op (Point 4715) Of Thakung Post Including All Tra
|
Description |
|
Organisation | Central Armed Police Forces | Ministry of Home Affairs |
Tender Id | GEM/2024/B/5342549 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | August 30, 2024 01:54 |
End Date |
19/09/2024 ( Expired 295 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
---|---|---|---|---|---|---|
1 | M/S ACE BUILDERS & ENGINEERS | Make : ACE prefab Model : FRP HUTS (2) ITBP47BN Title : Providing and installation of FRP Huts at Thakung OP (Point-4715) of Thakung Post including all tran | 14-09-2024 15:37:35 | Registered with designated Agency / Authority | MII MSE | Qualified |
2 | MAAS GENERATORS PRIVATE LIMITED | Make : MAAS Model : 5338247 Title : Providing and installation of 01 Nos FRP Shelter at Chushul Height (Point-5509) including all transp | 14-09-2024 12:46:48 | Vendor Assessed | MII MSE | Qualified |
3 | SKY GATES ENGINEERS PRIVATE LIMITED | Make : SEPL-FRP HUTS (ITBP-47BN) Model : FRP Huts at Thakung OP (Point-4715) Title : Providing and installation of FRP Huts at Thakung OP (Point-4715) of Thakung Post including all tran | 14-09-2024 14:43:39 | Registered with designated Agency / Authority | MII MSE | Qualified |
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreSupply installation testing commissioning of 6.3m ext c band antenna and acu at kulasekharapattinam
Supply installation testing commissioning of 6.3m ext c band antenna and acu at kulasekharapattinam
Read moreDevelopment of area from chainage 13.5 km to take off point including r and d yard to facilitate upcoming new projects at tekra
Development of area from chainage 13.5 km to take off point including r and d yard to facilitate upcoming new projects at tekra
Read moreDesign supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system at trichy dairy
Design supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system at trichy dairy for the year 2025-26
Read moreSupply, installation, testing and commissioning of 217 feet (66 meter) high mast tri colour national flag of size 60 feet x 90 feet with complete design at deendayal port authority at kandla
Supply, installation, testing and commissioning of 217 feet (66 meter) high mast tri colour national flag of size 60 feet x 90 feet with complete design at deendayal port authority at kandla
Read moreSupply, installation, testing and commissioning of tunnel lights fixtures at various ug stations of line-2n and line-6 of dmrc network.
Supply, installation, testing and commissioning of tunnel lights fixtures at various ug stations of line-2n and line-6 of dmrc network.
Read moreTender for installation, setting up and winding up of indian pavilion at biff sept. 17-26, 2025
Tender for installation setting up winding up and dismentaling of indian pavilion booth at biffbusan
Read moreP/l rcc np3 main gravity sewer line, const of mps of 67.50 mld, 900 mm i/d pumping main from proposed mps to 30 mld stp, stp of capacity 30 mld including 5 years o and m of mps and stp, p/l treated water pipeline form cct to disposal point at moga
P/l rcc np3 main gravity sewer line, const of mps of 67.50 mld, 900 mm i/d pumping main from proposed mps to 30 mld stp, stp of capacity 30 mld including 5 years o and m of mps and stp, p/l treated water pipeline form cct to disposal point at moga
Read moreDeployment of 23(twenty three) nos. unskilled workers and 01(one) no. supervisor for providing services to various departments at stps.
Deployment of 23(twenty three) nos. unskilled workers and 01(one) no. supervisor for providing services to various departments at stps.
Read moreSupply, erection, testing and commissioning of frp street light poles at north break water of vocpa
Supply, erection, testing and commissioning of frp street light poles at north break water of vocpa
Read moreof your Industry type