Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Track Suits, Uniforms, T Shirts, Warming Up T Shirts, Bags And Caps To The Players
|
Description |
Supply Of Track Suits, Uniforms, T Shirts, Warming Up T Shirts, Bags And Caps To The Players Participating In Inter Collegiate Inter Zonal Competition, South West Zone, &Amp#X0d
West Zone, Inter Zonal And All India Inter University Tournament For Yr 2024 25
|
Organisation | University of Mumbai | State Govt. and UT |
Tender Id | 2024_UNIMU_1084205_1 |
Reference Number |
Sports/30/2024-25 dt 06/09/2024 |
Tender Fee | 3500 |
EMD | 50000 |
Tender Value | |
Place | Dept. of Sports and Physical Education |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1892248 |
Start Date | September 12, 2024 16:30 |
End Date |
26/09/2024 ( Expired 227 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of bidder for purchase of one hundred percent shares in electricity company responsible for distribution and retail supply of electricity and having distribution license in the union territory of andaman and nicobar islands
Refer rfp for details of proposal, bid security details, general instruction to the bidders and all other matters related to the bid
Read moreRequest for pre qualification of bidders for maintenance works to be taken up on risk and cost of the concessionaire or contractor under the jurisdiction of ro jaipur
Request for pre qualification of bidders for maintenance works to be taken up on risk and cost of the concessionaire or contractor under the jurisdiction of ro jaipur
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreRehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply ,dismantling of old pet/ct scanner and transport to barc central stores ,installation and commissioning of digital pet/ct system
Supply ,dismantling of old pet/ct scanner and transport to barc central stores ,installation and commissioning of digital pet/ct system
Read moreRequest for pre-qualification (rfq) 2025 for the maintenance works to be taken up on risk and cost of the concessionaire/contractor under jurisdiction of ro lucknow
Request for pre-qualification (rfq) 2025 for the maintenance works to be taken up on risk and cost of the concessionaire/contractor under jurisdiction of ro lucknow
Read moreof your Industry type