Tender Details

About Tender

🏭 Invitation For Bids: Internal Improvement Works Of Cluster Section No. S 377 Package 5 🚿 The State Government And Union Territory's Water Supply And Sanitation Department Invites Bids For The Internal Improvement Works Of Cluster Section No. S 377 Package 5. This Project Encompasses The Enhancement Of Water Supply Schemes: 1. Shama Khan Ke 2. Baghe Wala 3. Jorki Kankar Wali The Works Are Located In Block Fazilka Arni Wala In S.S. District Fazilka. 📅 Bid Submission Deadline: July 11, 2024, 4:00 Pm Tender Fee: Inr 6900 Earnest Money Deposit (Emd): Inr 177338 Eligible Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Water Supply And Sanitation, State Govt. And Ut, Internal Improvement Works, Cluster Section S 377, Package 5, Jal Jeevan Mission, Fazilka, Bid Submission, Tender Fee, Emd
Particulars Details
Title
Internal Improvement Works Of Cluster Section No. S 377 Package 5
Description
Internal Improvement Works Of Cluster Section No. S 377 Package 5 For Water Supply Schemes 1. Shama Khan Ke 2. Baghe Wala 3. Jorki Kankar Wali Block Fazilka Arni Wala S.S Distt. Fazilka Under State Share Jjm
Organisation Water Supply and sanitation | State Govt. and UT
Tender Id 2024_WSS_122261_1
Reference
Number
DWSS5(2024) Internal Improvement Works of Cluster Section No.S-377 (Package-5)
Tender Fee 6900
EMD 1.77 Lakh
Tender Value
Place Fazilka
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=249538
Start Date June 19, 2024 21:30
End Date

11/07/2024 ( Expired 326 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Lot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir

Lot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir

Read more
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Read more
80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj

80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise