Tender Details
About Tender
🏭 Invitation For Bids: Internal Improvement Works Of Cluster Section No. S 377 Package 5 🚿 The State Government And Union Territory's Water Supply And Sanitation Department Invites Bids For The Internal Improvement Works Of Cluster Section No. S 377 Package 5. This Project Encompasses The Enhancement Of Water Supply Schemes: 1. Shama Khan Ke 2. Baghe Wala 3. Jorki Kankar Wali The Works Are Located In Block Fazilka Arni Wala In S.S. District Fazilka. 📅 Bid Submission Deadline: July 11, 2024, 4:00 Pm Tender Fee: Inr 6900 Earnest Money Deposit (Emd): Inr 177338 Eligible Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Water Supply And Sanitation, State Govt. And Ut, Internal Improvement Works, Cluster Section S 377, Package 5, Jal Jeevan Mission, Fazilka, Bid Submission, Tender Fee, EmdParticulars | Details |
---|---|
Title |
Internal Improvement Works Of Cluster Section No. S 377 Package 5
|
Description |
Internal Improvement Works Of Cluster Section No. S 377 Package 5 For Water Supply Schemes 1. Shama Khan Ke 2. Baghe Wala 3. Jorki Kankar Wali Block Fazilka Arni Wala S.S Distt. Fazilka Under State Share Jjm
|
Organisation | Water Supply and sanitation | State Govt. and UT |
Tender Id | 2024_WSS_122261_1 |
Reference Number |
DWSS5(2024) Internal Improvement Works of Cluster Section No.S-377 (Package-5) |
Tender Fee | 6900 |
EMD | 1.77 Lakh |
Tender Value | |
Place | Fazilka |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=249538 |
Start Date | June 19, 2024 21:30 |
End Date |
11/07/2024 ( Expired 326 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreLot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir
Lot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreGeneral-bridge safety-maintenance of bridge handrails of various bridges under bridges section no.3 thiruvananthapuram - general civil work
Civil work.
Read more80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj
80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj
Read moreof your Industry type