Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Main Valve Xv 1402,Commissioning Spares,Spare 2 Years
|
| Description |
|
| Organisation | Department of Fertilizers | Ministry of Chemicals and Fertilizers |
| Tender Id | GEM/2023/B/3704453 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | July 27, 2023 21:05 |
| End Date |
Expired
10/08/2023
Expired 1140 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Read moreHiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Hiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Read moreOutsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Read moreProcurement of parker(markwel)/gates/ manuli make high pressure hydraulic hoses for sdls, lhds jumbo drills, crushers etc., on rate contract for a period of 2 years on specific make basis.
Procurement of parker(markwel)/gates/ manuli make high pressure hydraulic hoses for sdls, lhds jumbo drills, crushers etc., on rate contract for a period of 2 years on specific make basis.
Read moreDesign, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreof your Industry type