Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Repairing Of New Shaft And Rotating Assembly Parts Of Sct 200/58 2 Pump, Kirloskar Make, That Has Been Obtained From Gkkc In Breakdown Condition At Ena Colliery, Kusunda Area.
|
| Description |
Complete Repairing Of New Shaft And Rotating Assembly Parts Of Sct 200/58 2 Pump, Kirloskar Make, That Has Been Obtained From Gkkc In Breakdown Condition At Ena Colliery, Kusunda Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_284164_1 |
|
Reference Number |
BCCL/AVI/EnM/2023-24/45 |
| Tender Fee | - |
| EMD | 3918 |
| Tender Value | - |
| Place | Kusunda Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | July 25, 2023 16:30 |
| End Date |
Expired
31/07/2023
Expired 1173 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Non-reversible thermal strips, vertical mounting self adhesive type, range from 50 to 120 deg c in steps of min 8 levels 50, 60, 70, 80, 90, 100, 110, 120 deg c, should show dual temp scale deg c and fahrenheit, should be oil, water dust and steam resistance, with accuracy of 1 percent +/- 1 deg c, size 40 x15mm, a colour change from silver/ white to black indicates that the rating has been reached for easy dentification stickers should be in blue/orange/yellow color.
Non-reversible thermal strips, vertical mounting self adhesive type, range from 50 to 120 deg c in steps of min 8 levels 50, 60, 70, 80, 90, 100, 110, 120 deg c, should show dual temp scale deg c and fahrenheit, should be oil, water dust and steam resistance, with accuracy of 1 percent +/- 1 deg c, size 40 x15mm, a colour change from silver/ white to black indicates that the rating has been reached for easy dentification stickers should be in blue/orange/yellow color.
Read moreRewinding of bhel make 6.6kv, 680kw, which has been brought from moodhidih colliery to ena colliery to 3.3kw 680kw, for running 4000gpm pump at ena ocp for dewatering purposes at kusunda area.
Rewinding of bhel
 make 6.6kv, 680kw,
 which has been
 brought from
 moodhidih colliery to
 ena colliery to 3.3kw
 680kw, for running
 4000gpm pump at
 ena ocp for
 dewatering purposes
 at kusunda area.
Read moreRepairing and maintenance of survey room in gkkc and ena and room in dhansar under kusunda area
Repairing and maintenance of survey room in gkkc and ena and room in dhansar under kusunda area
Read moreRepairing of the kirloskar make pump 10uph8 4000 gpm 150mtr head, as a stand by pump for ena ocp dewatering at ena colliery, kusunda area
Repairing of the kirloskar make pump 10uph8 4000 gpm 150mtr head, as a stand by pump for ena ocp dewatering at ena colliery, kusunda area
Read moreRepairing of er of 485kw motor 6.6kv into 3.3kv, 485kw that has been brought from pb project in damaged condition and it will be utilized for the dewatering of ena ocp if required during monsoon or where so ever deemed fit at ena colliery, kusun
Repairing of er of 485kw motor 6.6kv into 3.3kv, 485kw that has been brought from pb project in damaged condition and it will be utilized for the dewatering of ena ocp if required during monsoon or where so ever deemed fit at ena colliery, kusun
Read moreShifting of 6 inch m.s. pipe 15 nos. from gkkc c.h.p. to the khas kusunda u.g. and accordingly replacing the previous damaged 6 inch m.s. pipe from the u.g. as it has been hampering the proper water supply at filter plant and domestic water leading
Shifting of 6 inch m.s. pipe 15 nos. from gkkc c.h.p. to the khas kusunda u.g. and accordingly replacing the previous damaged 6 inch m.s. pipe from the u.g. as it has been hampering the proper water supply at filter plant and domestic water leading
Read moreVarious cable dismantling and heat shrinking for the purposes of feeder interchange so that 5 pumps of high gpm capacity could work at ena ocp for dewatering purposes at ena colliery kusunda area.
Various cable dismantling and heat shrinking for the purposes of feeder interchange so that 5 pumps of high gpm capacity could work at ena ocp for dewatering purposes at ena colliery kusunda area.
Read moreDismantling of 1.5 mva 11kv/3.3kv transformer and installation of 2 mva 11kv/3.3kv transformer in its place, via dismantling and installation from gkkc to ena colliery, at kusunda area
Dismantling of 1.5 mva 11kv/3.3kv transformer and installation of 2 mva 11kv/3.3kv transformer in its place, via dismantling and installation from gkkc to ena colliery, at kusunda area
Read moreRe-erection of conductor that were dislodged from insulators and entangle near ekra jone in 11kv 3p overhead line of alkusha-ena feeder under kusunda area.
Re-erection of conductor that were dislodged from insulators and entangle near ekra jone in 11kv 3p overhead line of alkusha-ena feeder under kusunda area.
Read moreThe repairing of rotor and cooling system of 485kw motor 6.6kv into 3.3kv, 485 kw, that has been brought from pb project in damaged condition and it will be utilized for the dewatering of ena ocp if required during monsoon or where so ever deemed fit
The repairing of rotor and cooling system of 485kw motor 6.6kv into 3.3kv, 485 kw, that has been brought from pb project in damaged condition and it will be utilized for the dewatering of ena ocp if required during monsoon or where so ever deemed fit
Read moreof your Industry type