Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Er Of 485kw Motor 6.6kv Into 3.3kv, 485kw That Has Been Brought From Pb Project In Damaged Condition And It Will Be Utilized For The Dewatering Of Ena Ocp If Required During Monsoon Or Where So Ever Deemed Fit At Ena Colliery, Kusun
|
| Description |
Repairing Of Er Of 485kw Motor 6.6kv Into 3.3kv, 485kw That Has Been Brought From Pb Project In Damaged Condition And It Will Be Utilized For The Dewatering Of Ena Ocp If Required During Monsoon Or Where So Ever Deemed Fit At Ena Colliery, Kusun
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_336247_1 |
|
Reference Number |
BCCL/AVI/EnM/2025-26/15 |
| Tender Fee | 0 |
| EMD | 5400 |
| Tender Value | - |
| Place | Ena |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348560 |
| Start Date | May 28, 2025 16:30 |
| End Date |
Expired
10/06/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
The repairing of rotor and cooling system of 485kw motor 6.6kv into 3.3kv, 485 kw, that has been brought from pb project in damaged condition and it will be utilized for the dewatering of ena ocp if required during monsoon or where so ever deemed fit
The repairing of rotor and cooling system of 485kw motor 6.6kv into 3.3kv, 485 kw, that has been brought from pb project in damaged condition and it will be utilized for the dewatering of ena ocp if required during monsoon or where so ever deemed fit
Read moreRewinding of bhel make 6.6kv, 680kw, which has been brought from moodhidih colliery to ena colliery to 3.3kw 680kw, for running 4000gpm pump at ena ocp for dewatering purposes at kusunda area.
Rewinding of bhel
 make 6.6kv, 680kw,
 which has been
 brought from
 moodhidih colliery to
 ena colliery to 3.3kw
 680kw, for running
 4000gpm pump at
 ena ocp for
 dewatering purposes
 at kusunda area.
Read moreComplete repairing of new shaft and rotating assembly parts of sct 200/58-2 pump, kirloskar make, that has been obtained from gkkc in breakdown condition at ena colliery, kusunda area.
Complete repairing of new shaft and rotating assembly parts of sct 200/58-2 pump, kirloskar make, that has been obtained from gkkc in breakdown condition at ena colliery, kusunda area.
Read moreEstimate for laying underground pipeline for watercourses in doraha sub division where earth has been lifted (part-1)
Estimate for laying underground pipeline for watercourses in doraha sub division where earth has been lifted (part-1)
Read moreestimate for laying pipelines for water course starting from rd 58390/r of talwandi disty where earth has been lifted
estimate for laying pipelines for water course starting from rd 58390/r of talwandi disty where earth has been lifted
Read moreEstimate for laying pipelines for water course starting from rd 58390/r of talwandi disty where earth has been lifted
Estimate for laying pipelines for water course starting from rd 58390/r of talwandi disty where earth has been lifted
Read moreConstruction of road dividers and other related works at the locations on pune-nagar road where the brt has been removed.
Construction of road dividers and other related works at the locations on pune-nagar road where the brt has been removed.
Read moreIt has been informed by the engineer, electrical testing division-chandauli that the work of getting mu based billed idf status meters coming in electricity distribution subdivision-second/third, jivnathpur/chakiya.
It has been informed by the engineer, electrical testing division-chandauli that the work of getting mu based billed idf status meters coming in electricity distribution subdivision-second/third, jivnathpur/chakiya.
Read morePercent ufeffspacers is a holding chambers made-up of transparent, static-free spacer with a valve that hold the medication for a few seconds after it has been released from the mdi
For complete deion and other details, please refer to tender
Read morePercent ufeffspacers is a holding chambers made-up of transparent, static-free spacer with a valve that hold the medication for a few seconds after it has been released from the mdi
For complete deion and other details, please refer to tender
Read moreof your Industry type