Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Cad Dismantling And Replacement Of Wornout And Punctured 200 Nb Ms Erw Pipe Of Service Water Line From 300/200 Reducer Near Scs Unit V Entrance Of Unit Iv And V Acw System
|
Description |
Ttps Operation Circle Cad Dismantling And Replacement Of Wornout And Punctured 200 Nb Ms Erw Pipe Of Service Water Line From 300/200 Reducer Near Scs Unit V Entrance Of Unit Iv And V Acw System
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_460496_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.182/24-25 |
Tender Fee | 0 |
EMD | 500 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=547383 |
Start Date | July 05, 2024 23:30 |
End Date |
18/07/2024 ( Expired 279 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of ms pipe line 200 mm dia. from river bed pump to chp of hloc mine , hlsa including soil excavation and replacement of damaged pipe.
Repairing of ms pipe line 200 mm dia. from river bed pump to
 chp of hloc mine , hlsa including soil excavation and
 replacement of damaged pipe.
Read moreSupply of 200nb, 250nb and 300nb ms erw pipe for unit-i, ii and iii surge hopper to silo fly ash conveying lines
Supply of 200nb, 250nb and 300nb ms erw pipe for unit-i, ii and iii surge hopper to silo fly ash conveying lines
Read moreReplacement of damaged water supply line in front of ms. bajaj auto by m.s.300 mm dia. pipe line.
Pimpri chinchwad industrial area m and r to water supply scheme replacement of damaged water supply line in front of ms. bajaj auto by m.s.300 mm dia. pipe line.
Read moreRepair/maintenance of 300/250/200 mm dia ms / gi pipe line as and when required before and during monsoon 2025 within mine area at bina project
Repair/maintenance of 300/250/200 mm dia ms / gi pipe line as and when required before and during monsoon 2025 within mine area at bina project
Read moreTtps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Read moreTtps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle cad cwph i periodical cleaning of fishnets and trash rack gates provided in the cooling water intake channel i at harbour skimmer bay for unit i, ii and iii for the period from 01.04.2025 to 31.03.2026
Ttps operation circle cad cwph i periodical cleaning of fishnets and trash rack gates provided in the cooling water intake channel i at harbour skimmer bay for unit i, ii and iii for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle cad cwph i lifting of the trash rack screen from the cwph i fore bay, cleaning of the debris and re erection in its position for unit i, ii and iii for the period from 01.04.2025 to 31.03.2026
Ttps operation circle cad cwph i lifting of the trash rack screen from the cwph i fore bay, cleaning of the debris and re erection in its position for unit i, ii and iii for the period from 01.04.2025 to 31.03.2026
Read moreof your Industry type