Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Cad Dismantling The Wornout Structure Portion, Fabrication And Erection Of M.S Structure For Self Cleaning Strainer 5 A 5 B Of Acw System Unit V
|
| Description |
Ttps Operation Circle Cad Dismantling The Wornout Structure Portion, Fabrication And Erection Of M.S Structure For Self Cleaning Strainer 5 A 5 B Of Acw System Unit V
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_367555_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.162/23-24 |
| Tender Fee | 0 |
| EMD | 2800 |
| Tender Value | - |
| Place | O/o SE/O/TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | September 07, 2023 18:50 |
| End Date |
Expired
21/09/2023
Expired 1122 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Ttps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Read moreTtps operation circle cad cwph ii unit v annual overhauling of travelling water screen 5a to 5d for the year 2026 to 2027
Ttps operation circle cad cwph ii unit v annual overhauling of travelling water screen 5a to 5d for the year 2026 to 2027
Read moreTtps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Read moreTtps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator body in mill 5b, 5c, 5d and 5e
Ttps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator body in mill 5b, 5c, 5d and 5e
Read moreTtps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreTtps mech ii bm unit i rectification of supporting structure of aph duct hopper area reconditioning of eroded portion of primary secondary air damper duct and manhole doors
Ttps mech ii bm unit i rectification of supporting structure of aph duct hopper area reconditioning of eroded portion of primary secondary air damper duct and manhole doors
Read moreTtps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Ttps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Read moreTtps operation circle cad unit v annual overhauling of self cleaning strainer 5a and 5b gear box of unit v acw system
Ttps operation circle cad unit v annual overhauling of self cleaning strainer 5a and 5b gear box of unit v acw system
Read moreTtps operation circle cad unit v annual overhauling of heat exchangers 5a, 5b and 5c cleaning and painting of auxiliary cooling water tank of unit v acw system
Ttps operation circle cad unit v annual overhauling of heat exchangers 5a, 5b and 5c cleaning and painting of auxiliary cooling water tank of unit v acw system
Read moreTtps operation circle cad cwph ii strengthening and modification of failed top structure by available second hand top structure (cwph i model) in tws 5a, 5b, 5c and 5d
Ttps operation circle cad cwph ii strengthening and modification of failed top structure by available second hand top structure (cwph i model) in tws 5a, 5b, 5c and 5d
Read moreof your Industry type