Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Cad Cwph Ii Strengthening And Modification Of Failed Top Structure By Available Second Hand Top Structure (Cwph I Model) In Tws 5 A, 5 B, 5 C And 5 D
|
| Description |
Ttps Operation Circle Cad Cwph Ii Strengthening And Modification Of Failed Top Structure By Available Second Hand Top Structure (Cwph I Model) In Tws 5 A, 5 B, 5 C And 5 D
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_373532_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.167/23-24 |
| Tender Fee | 0 |
| EMD | 6000 |
| Tender Value | - |
| Place | O/o SE/O/TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | September 26, 2023 22:40 |
| End Date |
Expired
10/10/2023
Expired 1103 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle cad cwph ii unit v annual overhauling of travelling water screen 5a to 5d for the year 2026 to 2027
Ttps operation circle cad cwph ii unit v annual overhauling of travelling water screen 5a to 5d for the year 2026 to 2027
Read moreTtps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Ttps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Read moreTtps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator body in mill 5b, 5c, 5d and 5e
Ttps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator body in mill 5b, 5c, 5d and 5e
Read moreFlap door arrangement complete for boxnhl wagon ( assembly of item no. 3, 4, 5a, 5b, 5c, 10, 11, 12, 13, 14, 16 & 17) as per rdso drawing no. wd-23018-s-02 alt-5.
Flap door arrangement complete for boxnhl wagon ( assembly of item no. 3, 4, 5a, 5b, 5c, 10, 11, 12, 13, 14, 16 & 17) as per rdso drawing no. wd-23018-s-02 alt-5.
Read moreSupply of bowl bottom rubber bearing housing for cooling water pump 5a 5b 5c and 5d of unit v
Supply of bowl bottom rubber bearing housing for cooling water pump 5a 5b 5c and 5d of unit v
Read moreTtps operation circle cad cwph ii unit v annual overhauling work overhauling of 1200mm butterfly valve gear boxes and air release valves of cooling water pumps 5a, 5b, 5c and 5d, replacement of wornout body seal ring/disc sea ring in 1200mm butter
Ttps operation circle cad cwph ii unit v annual overhauling work overhauling of 1200mm butterfly valve gear boxes and air release valves of cooling water pumps 5a, 5b, 5c and 5d, replacement of wornout body seal ring/disc sea ring in 1200mm butter
Read moreTtps es circle em iii prive maintenance repairing and painting of ht motors of id fan motors 5b fd fan motors 5a 5b pa fan motors 5a 5b and coal mill motors 5a 5b 5c 5d 5e 5f during annual statutory overhauling of unit v for the year 202
Ttps es circle em iii prive maintenance repairing and painting of ht motors of id fan motors 5b fd fan motors 5a 5b pa fan motors 5a 5b and coal mill motors 5a 5b 5c 5d 5e 5f during annual statutory overhauling of unit v for the year 202
Read moreTtps operation circle cad cwph ii renewal of worn out bearings in top structure of tws 4a,4b,4c 4d in unit iv at cooling water pump house ii
Ttps operation circle cad cwph ii renewal of worn out bearings in top structure of tws 4a,4b,4c 4d in unit iv at cooling water pump house ii
Read moreTtps operation circle cad dismantling the wornout structure portion, fabrication and erection of m.s structure for self cleaning strainer 5a 5b of acw system unit v
Ttps operation circle cad dismantling the wornout structure portion, fabrication and erection of m.s structure for self cleaning strainer 5a 5b of acw system unit v
Read moreTtps operation circle cad unit v annual overhauling of heat exchangers 5a, 5b and 5c cleaning and painting of auxiliary cooling water tank of unit v acw system
Ttps operation circle cad unit v annual overhauling of heat exchangers 5a, 5b and 5c cleaning and painting of auxiliary cooling water tank of unit v acw system
Read moreof your Industry type