Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Cad Cwph Ii Unit V Annual Overhauling Work Overhauling Of 1200mm Butterfly Valve Gear Boxes And Air Release Valves Of Cooling Water Pumps 5 A, 5 B, 5 C And 5 D, Replacement Of Wornout Body Seal Ring/Disc Sea Ring In 1200mm Butter
|
| Description |
Ttps Operation Circle Cad Cwph Ii Unit V Annual Overhauling Work Overhauling Of 1200mm Butterfly Valve Gear Boxes And Air Release Valves Of Cooling Water Pumps 5 A, 5 B, 5 C And 5 D, Replacement Of Wornout Body Seal Ring/Disc Sea Ring In 1200mm Butter
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_602939_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.200/25-26 |
| Tender Fee | 0 |
| EMD | 2200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=720734 |
| Start Date | September 11, 2025 22:30 |
| End Date |
Expired
25/09/2025
Expired 385 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle cad cwph ii strengthening and modification of failed top structure by available second hand top structure (cwph i model) in tws 5a, 5b, 5c and 5d
Ttps operation circle cad cwph ii strengthening and modification of failed top structure by available second hand top structure (cwph i model) in tws 5a, 5b, 5c and 5d
Read moreSupply of bowl bottom rubber bearing housing for cooling water pump 5a 5b 5c and 5d of unit v
Supply of bowl bottom rubber bearing housing for cooling water pump 5a 5b 5c and 5d of unit v
Read moreTtps es circle em iii prive maintenance repairing and painting of ht motors of id fan motors 5b fd fan motors 5a 5b pa fan motors 5a 5b and coal mill motors 5a 5b 5c 5d 5e 5f during annual statutory overhauling of unit v for the year 202
Ttps es circle em iii prive maintenance repairing and painting of ht motors of id fan motors 5b fd fan motors 5a 5b pa fan motors 5a 5b and coal mill motors 5a 5b 5c 5d 5e 5f during annual statutory overhauling of unit v for the year 202
Read moreTtps operation circle cad cwph ii unit iv annual overhauling work-overhauling of 1200mm butterfly valve gear boxes and air release valves of cooling water pumps 4a, 4b, 4c and 4d, replacement of wornout body seal ring disc sea ring in 1200mm butte
Ttps operation circle cad cwph ii unit iv annual overhauling work-overhauling of 1200mm butterfly valve gear boxes and air release valves of cooling water pumps 4a, 4b, 4c and 4d, replacement of wornout body seal ring disc sea ring in 1200mm butte
Read moreEchp-i-attending breakdown and prive maintenance works such as replacement of wornout conveyor belt, gear coupling and overhauling in belt feeder shuttle feeder rbfd 20,21,bfd 22,23 sfd 4a,4b,5a,5b and 5c at sch-i
Echp-i-attending breakdown and prive maintenance works such as replacement of wornout conveyor belt, gear coupling and overhauling in belt feeder shuttle feeder rbfd 20,21,bfd 22,23 sfd 4a,4b,5a,5b and 5c at sch-i
Read moreC/o 45 mtr wide road along pocket-5a ,5b and 5c (point c to f)in sector -18,yea
C/o 45 mtr wide road along pocket-5a ,5b and 5c (point c to f)in sector -18,yea
Read moreSweeping and cleaning to common staircase and outside premises area etc to 1632 ts of transit camp building no 5a 5b 5c 5d and 5e at bombay dyeing mill wadala mumbai period 01022025 to 31012026
Sweeping and cleaning to common staircase and outside premises area etc to 1632 ts of transit camp building no 5a 5b 5c 5d and 5e at bombay dyeing mill wadala mumbai period 01022025 to 31012026
Read moreTtps operation circle cad unit v annual overhauling of heat exchangers 5a, 5b and 5c cleaning and painting of auxiliary cooling water tank of unit v acw system
Ttps operation circle cad unit v annual overhauling of heat exchangers 5a, 5b and 5c cleaning and painting of auxiliary cooling water tank of unit v acw system
Read moreEchp-i-attending breakdown and prive maintenance works such as replacement of wornout conveyor belt, gear coupling in belt feeder shuttle feeder rbfd 20,21,bfd 22,23 sfd 4a,4b,5a,5b and 5c at sch-i
Echp-i-attending breakdown and prive maintenance works such as replacement of wornout conveyor belt, gear coupling in belt feeder shuttle feeder rbfd 20,21,bfd 22,23 sfd 4a,4b,5a,5b and 5c at sch-i
Read moreReplacing the existing wornout msroof by a new galvanume sheet in id fan motor 5a 5bpa fan motor 5afd fan motor 5a 5b in unit 5 boiler area
Replacing the existing wornout msroof by a new galvanume sheet in id fan motor 5a 5bpa fan motor 5afd fan motor 5a 5b in unit 5 boiler area
Read moreof your Industry type