| Title |
Ttps Operation Circle Cad Acwph Unit Ii Capital Overhauling Dismantling And Renewal Of Wornout And Punctured Pipes Of Bearing Cooling Water Supply And Header 600 Nb Ms Pipe Line Of Acw System Near Mill Plant I Area And 600 Nb Head
|
| Description |
Ttps Operation Circle Cad Acwph Unit Ii Capital Overhauling Dismantling And Renewal Of Wornout And Punctured Pipes Of Bearing Cooling Water Supply And Header 600 Nb Ms Pipe Line Of Acw System Near Mill Plant I Area And 600 Nb Head
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_452751_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.117/24-25 |
| Tender Fee | 0 |
| EMD | 22100 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=538920 |
| Start Date | June 08, 2024 14:30 |
| End Date |
Expired
13/06/2024
Expired 857 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Read moreTtps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Ttps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Read moreTtps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Ttps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Read moreTtps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Ttps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Read moreTtps operation circle cad unit iv and v annual overhaul overhauling of nrvs in sea water booster pumps and auxiliary cooling water pumps of a.c.w system iv and v
Ttps operation circle cad unit iv and v annual overhaul overhauling of nrvs in sea water booster pumps and auxiliary cooling water pumps of a.c.w system iv and v
Read moreTtps operation circle cad overhauling of storm water pump a and b in storm water pump house ii and screen wash pump a, b and c in cooling water pump house ii
Ttps operation circle cad overhauling of storm water pump a and b in storm water pump house ii and screen wash pump a, b and c in cooling water pump house ii
Read moreTtps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Ttps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Read moreTtps operation circle cad acwph unit iii dismantling and replacement of wornout, punctured and damaged 600 nb return header pipe line of unit iii acw system in acwph i trough area
Ttps operation circle cad acwph unit iii dismantling and replacement of wornout, punctured and damaged 600 nb return header pipe line of unit iii acw system in acwph i trough area
Read moreTtps operation circle cad acwph unit ii capital overhauling dismantling and renewal of wornout, damaged and punctured pipes of bearing cooling water supply and common discharge header 600 nb ms pipe line
Ttps operation circle cad acwph unit ii capital overhauling dismantling and renewal of wornout, damaged and punctured pipes of bearing cooling water supply and common discharge header 600 nb ms pipe line
Read moreTtps operation circle cad acwph unit ii captial overhauling dismantling and renewal of wornout, corroded and punctured pipes in cooling tower trough outlet 750/450 nb acw pumps common suction header, 400 nb pipe distribution pipes head
Ttps operation circle cad acwph unit ii captial overhauling dismantling and renewal of wornout, corroded and punctured pipes in cooling tower trough outlet 750/450 nb acw pumps common suction header, 400 nb pipe distribution pipes head
Read moreof your Industry type