Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Ii Coal Flow System To Boiler Rotating The Existing Eroded Straight Coal Pipes Of Mills 2 A 2 B 2 D 2 E 2 F To 180 Deg At 16 Meter Level Above The Mill And Below The 18 Meter Floor Etc During Capital Overhaul 2024 25
|
Description |
Mtps I Mill Plant Unit Ii Coal Flow System To Boiler Rotating The Existing Eroded Straight Coal Pipes Of Mills 2 A 2 B 2 D 2 E 2 F To 180 Deg At 16 Meter Level Above The Mill And Below The 18 Meter Floor Etc During Capital Overhaul 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_500423_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.250/ 2024-25 |
Tender Fee | 0 |
EMD | 9800 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=594987 |
Start Date | November 12, 2024 21:30 |
End Date |
18/11/2024 ( Expired 155 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes to boiler corner 1 to 4 to 180 deg at 16 meter level near boiler area during capital overhaul 2024 25
Mtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes to boiler corner 1 to 4 to 180 deg at 16 meter level near boiler area during capital overhaul 2024 25
Read moreMtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25
Mtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25
Read moreMtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes of mills 2a 2b 2d 2e 2f to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25
Mtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes of mills 2a 2b 2d 2e 2f to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air
Read moreof your Industry type