Tender Details
Particulars | Details |
---|---|
Title |
A) Elimination Of Lc No. 17 At Railway Km 799.862 Construction Of Rcc Box 5.5 X 4.5 M By Pushing/Sliding Method On Sevagram Ballharshah Section.
B) Elimination Of Lc No. 18 At Railway Km 802.492 Construction Of Rcc Box 5.5 X 4.5 M By Pushing/Sliding Method On Sevagram Ballharshah Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76995088 |
Reference Number |
DRMWNGP-76-2024-02 |
Tender Fee | 0 |
EMD | 5.22 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76995088/viewNitPdf_4689227.pdf |
Start Date | August 23, 2024 01:09 |
End Date |
13/09/2024 ( Expired 267 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreof your Industry type