Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1) Amla Chhindwara Section Construction Of Rub By Pushing/Sliding Method In Lieu Of Lc No. Ap 4 C Class Km 880.141.
2) Amla Chhindwara Section Construction Of Rub By Pushing/Sliding Method In Lieu Of Lc No Pc 20 C Class Km 988.088.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72708602 |
|
Reference Number |
DRMWNGP-101-2023-02 |
| Tender Fee | 0 |
| EMD | 4.88 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72708602/viewNitPdf_4433520.pdf |
| Start Date | December 21, 2023 00:56 |
| End Date |
Expired
11/01/2024
Expired 1008 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.
Hyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.
Read moreOhe modification and other allied work in connection with converting bayad station from d class to b class and provision of rub in lieu of 07 rub in nadiad - modasa section .
Ohe modification and other allied work in connection with converting bayad station from d class to b class and provision of rub in lieu of 07 rub in nadiad - modasa section .
Read more1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
Read moreConstruction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Read moreProvision of associated s&t work in connection with provision of rub in lieu of lc no. 03 (hufp-lljp), lc no. 9 c (gtht-lljp), lc no. 10 (lljp-vshi), lc no. 12 c (lljp-vshi), lc no. 13 c (lljp-vshi), lc no. 16 (lljp-vshi) & lc no. 18 (khi-grl) in see division .
Provision of associated s&t work in connection with provision of rub in lieu of lc no. 03 (hufp-lljp), lc no. 9 c (gtht-lljp), lc no. 10 (lljp-vshi), lc no. 12 c (lljp-vshi), lc no. 13 c (lljp-vshi), lc no. 16 (lljp-vshi) & lc no. 18 (khi-grl) in see division .
Read moreSpgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations
Spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations
Read moreOhe modification and other allied work in connection with accomodation of 12 coach memu and provision of rub in lieu of 5 lc in anand-khambat section
Ohe modification and other allied work in connection with accomodation of 12 coach memu and provision of rub in lieu of 5 lc in anand-khambat section
Read more1. provision of limited height sub-way in lieu of lc no. 27/c b/w msk - mne at km 109/2-4. 2. provision of rub in lieu of lc no. 16-c/e-2 b/w nna - thb at km 67.84. 3. provision of limited height sub-way in lieu of lc no. 21 b b/w brkb - psr at km 86/10-12. 4. provision of limited height sub-way in lieu of lc no. 7/c b/w kue - bkhr at km 37/19-21 5. provision of limited height sub-way in lieu of lc no. 10 at km 53/1-3 between nna-ktrh section of see division.
1. provision of limited height sub-way in lieu of lc no. 27/c b/w msk - mne at km 109/2-4. 2. provision of rub in lieu of lc no. 16-c/e-2 b/w nna - thb at km 67.84. 3. provision of limited height sub-way in lieu of lc no. 21 b b/w brkb - psr at km 86/10-12. 4. provision of limited height sub-way in lieu of lc no. 7/c b/w kue - bkhr at km 37/19-21 5. provision of limited height sub-way in lieu of lc no. 10 at km 53/1-3 between nna-ktrh section of see division.
Read moreSr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)
Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)
Read moreElectrical works for 1) at tsk division: provision of 01 no rub by elimination of l-xing (rm-267) at km 307/5-6 at tsk division. 2) proposed construction of rub/lhs in lieu of lc gate no. rm-282 at km 329/6-7 between section bgnd-gom under the jurisdiction of aden/nlp.3) proposed construction of rub/lhs in lieu of lc gate no. rm-287 at km 340/9-341/0 between section gom-dmc under the jurisdiction of aden/nlp. 4) at tsk division: provision of 01 no rub by elimination of l-xing at rm-290 at tsk
Electrical works for 1) at tsk division: provision of 01 no rub by elimination of l-xing (rm-267) at km 307/5-6 at tsk division. 2) proposed construction of rub/lhs in lieu of lc gate no. rm-282 at km 329/6-7 between section bgnd-gom under the jurisdiction of aden/nlp.3) proposed construction of rub/lhs in lieu of lc gate no. rm-287 at km 340/9-341/0 between section gom-dmc under the jurisdiction of aden/nlp. 4) at tsk division: provision of 01 no rub by elimination of l-xing at rm-290 at tsk
Read moreof your Industry type