Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rub (Full Height Subway) Between Chbt Byl Station (Box Pushing Method) At Km.732/13 15 (732.707) For Traffic Facility In Lieu Of Mohabhatta Gate (Lc No.372) Of Raipur Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79357323 |
Reference Number |
E-R-T-105-24-25 |
Tender Fee | 0 |
EMD | 5.95 Lakh |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79357323/viewNitPdf_4823630.pdf |
Start Date | January 07, 2025 22:25 |
End Date |
03/02/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreProviding architectural and engineering consultancy services for construction of rob in lieu of lc no. 57 at km 198 17 19 between amarda road
Providing architectural and engineering consultancy services for construction of rob in lieu of lc no. 57 at km 198 17 19 between amarda road and basta of kharagpur division, odisha
Read moreConstruction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreHubballi division- hubballi-ballari section: 1) construction of subway at km 117/000-100 in lieu of lc no.66 at km.117/600-700 between koppal and ginigera stations (balance works). 2) construction of subway in lieu of lc no.62 at km 116/100-200 between koppal and ginigera stations (balance works)
For complete deion and other details, please refer to tender
Read moreExecution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreConstruction of rub in lieu of lc no.rv-20 at km.27/1-2 between mndh-lae station alongwith electrical work of raipur division.
For complete deion and other details, please refer to tender
Read moreof your Industry type