Tender Details
Particulars | Details |
---|---|
Title |
Electrical (G) Works In Connection With Construction Of Limited Height Subway/Rub In Lieu Of Existing Unauthorized Crossing At Km 372/44 B 46 B In Section Pdph Jkda Under Aden/Dps.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79106778 |
Reference Number |
51-EL-WT-2024-25 |
Tender Fee | 0 |
EMD | 5900 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79106778/viewNitPdf_4811175.pdf |
Start Date | January 07, 2025 00:21 |
End Date |
03/02/2025 ( Expired 78 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConstruction of uni-directional grade separated structure with slip service roads (km. 247 00 to km 248 679)(jhiri chowk on of bajaura bypass) on existing 4 lane of takoli-kullu section of nh-3 in the state of himachal pradesh on epc mode
Construction of uni-directional grade separated structure with slip service roads (km. 247 00 to km 248 679)(jhiri chowk on of bajaura bypass) on existing 4 lane of takoli-kullu section of nh-3 in the state of himachal pradesh on epc mode
Read moreWidening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Widening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Read moreBay modification works in connection with erection of 2nd 50mva ptr at 132kvss pedavegi
Bay modification works in connection with erection of 2nd 50 mva, 132/33kv ptr in the place of existing 31.5 mva, 132/33kv ptr under augmentation scheme at 132/33kv sub station, pedavegi in om circle, eluru
Read moreof your Industry type