Tender Details

Particulars Details
Title
Wbud/Bda/Ceo/E Nit 06/2024 25
Description
Construction Of High Drain From Dvc To Subjola Beside The Katwa Road Under Burdwan Planning Area (3rd Call).
Organisation BURDWAN DEVELOPMENT AUTHORITY | State Govt. and UT
Tender Id 2024_BDA_773228_1
Reference
Number
WBUD/BDA/CEO/e-NIT-06/2024-25
Tender Fee 0
EMD 3.37 Lakh
Tender Value
Place Subjola, Katwa Road
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1711814

Start Date November 26, 2024 00:00
End Date
Expired 18/12/2024

Expired 550 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Desilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)

Desilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)

Read more
Renovation construction of concrete road at durgapur s/s under gomd-vi, dvc, durgapur

Renovation construction of concrete road at durgapur s/s under gomd-vi, dvc, durgapur

Read more
Macadamization of road from khurmang to leeran km 3rd to onwards

Macadamization of road from khurmang to leeran km 3rd to onwards

Read more
Providing and laying wire crates on link road mohalla khajuria panjgrian pyt. lehar under permanent restoration (fy 2026-27) (ist call)

Construction of drain on link road from h/o sarpanch to pyt. ghar bheeri taryai pyt. bheeri taryai block bhalwal brahmana under permanent restoration (fy 2026-27) (ist call)

Read more
Construction of road from pwd road to bagiriaguda under mmsy-trip in the district of malkangir for the year 2025-26.

Construction of road from pwd road to bagiriaguda under mmsy-trip in the district of malkangir for the year 2025-26.

Read more
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road

Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road

Read more
Construction of road from kondapuri to barawada under mmsy-trip in the district of nabarangpur for the year 2025-26.

Construction of road from kondapuri to barawada under mmsy-trip in the district of nabarangpur for the year 2025-26.

Read more
Construction of r.c.c box type drain from gugga maidi to barara road in ward no. 6 under mc shahabad (m.)

Construction of r.c.c box type drain from gugga maidi to barara road in ward no. 6 under mc shahabad (m.)

Read more
Con from single bus arrangement to double bus arrangement at 66kv side of 220/66kv khadoli substation in ut of dnh and dd (3rd call).

Con from single bus arrangement to double bus arrangement at 66kv side of 220/66kv khadoli substation in ut of dnh and dd (3rd call).

Read more
Construction of pacca drain from haratala icds to jhantu bishay at bhagirathbar under sarisakhola gram panchyat

Construction of pacca drain from haratala icds to jhantu bishay at bhagirathbar under sarisakhola gram panchyat

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise