Tender Details

Particulars Details
Title
Execution Of Balance Work And Maintenance Work Of The Itarsi Betul Section Of Nh 46 From Ch. 63.00 To Km 137.000 Except Tiger Corridor Section At The Risk And Cost Of Contractor
Description
Execution Of Balance Work And Maintenance Work Of The Itarsi Betul Section Of Nh 46 From Ch. 63.00 To Km 137.000 Except Tiger Corridor Section At The Risk And Cost Of Contractor
Organisation National Highways Authority of India | RO-Bhopal - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 10000
EMD 22.89 Lakh
Tender Value 22.89 Crore
Place
Link Login to view
Start Date October 06, 2026 14:30
End Date
Open 05/11/2026

22 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha

Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha

Read more
Sc for supervision for four laning of itarsi to betul section of nh46 from km 63.000 to km 137.000 design length 53.045 km excluding tiger corridor in the state of mp package ii nh69 on epc mode

Sc for supervision for four laning of itarsi to betul section of nh46 from km 63.000 to km 137.000 design length 53.045 km excluding tiger corridor in the state of mp package ii nh69 on epc mode

Read more
Routine maintenance work form km. 61.500 to km 67.380, km 80.940 to 88.640 and km. 108.933 to km. 116.263 tiger corridor on itarsi betul section of nh 69 new nh 46 in the state of madhya pradesh.

Routine maintenance work form km. 61.500 to km 67.380, km 80.940 to 88.640 and km. 108.933 to km. 116.263 tiger corridor on itarsi betul section of nh 69 new nh 46 in the state of madhya pradesh.

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Execution of part works for construction of block 1 at general pool office accommodation (gpoa), netaji nagar, new delhi at risk and cost of existing contractor

Execution of part works for construction of block 1 at general pool office accommodation (gpoa), &#x0d netaji nagar, new delhi at risk and cost of existing &#x0d contractor

Read more
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor

Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor

Read more
Dbm laying on affected length of new nh 27 from km 454 to 470 of dalkhola- islampur section and pothole repair work for entire stretch from dalkhola-ghoshpukur km 447 to 551 except islampur bypass at the risk and cost of o and m contractor

Dbm laying on affected length of new nh 27 from km 454 to 470 of dalkhola- islampur section and pothole repair work for entire stretch from dalkhola-ghoshpukur km 447 to 551 except islampur bypass at the risk and cost of o and m contractor

Read more
Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Read more
Invitation of quotation only from empaneled agencies under ro-madurai for execution of soil nailing work in kalamavur rob at km 21.600 in trichy - karaikudi section of nh-336 on item rate basis at the risk and cost of item rate contractor

Invitation of quotation only from empaneled agencies under ro-madurai for execution of soil nailing work in kalamavur rob at km 21.600 in trichy - karaikudi section of nh-336 on item rate basis at the risk and cost of item rate contractor

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise