Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution Of Operation And Maintenance Works On Selected Stretches Of Puintola Tangi Of Nh 16 Including Construction Of Drains And Slabs At Location Delinked From Scope Of Epc Contractor At The Risk N Cost Of Epc Contractor 2nd Call
|
| Description |
Execution Of Operation And Maintenance Works On Selected Stretches Of Puintola Tangi Of Nh 16 Including Construction Of Drains And Slabs At Location Delinked From Scope Of Epc Contractor At The Risk N Cost Of Epc Contractor 2nd Call
|
| Organisation | National Highways Authority of India | RO-Bhubaneswar - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 10000 |
| EMD | 27.3 Lakh |
| Tender Value | 13.65 Crore |
| Place | |
| Link | Login to view |
| Start Date | October 16, 2026 00:25 |
| End Date |
Open
22/10/2026
6 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Read moreRectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read moreExecution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Read more4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.
4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.
Read moreRoutine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Routine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Read more8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
Read moreOperation and maintenance work at risk and cost of epc contractor at selected stretches of puintola tangi of nh 16 in the state of odisha
Operation and maintenance work at risk and cost of epc contractor at selected stretches of puintola tangi of nh 16 in the state of odisha
Read moreConstruction of service road and drain at selected stretches descoped in tangi bhubaneswar
Construction of service road and
 drain at selected stretches descoped
 in tangi bhubaneswar
 section from km. 355.000 to
 km. 414.000 of nh 16 in the
 state of odisha.
Read moreConstruction of foot over bridge near gandapalli at km 301.560 on puintola tangi section in the state of odisha on epc mode
Construction of foot over bridge near gandapalli at km 301.560 on puintola tangi section in the state of odisha on epc mode
Read moreof your Industry type