Tender Details

Particulars Details
Title
Execution Of Pothole Rectification/Filling Works Of Nh 53 At The Risk N Cost Of The Epc Contractor Of Duburi Chandikhole Of Nh 53 In The State Of Odisha
Description
Execution Of Pothole Rectification/Filling Works Of Nh 53 At The Risk N Cost Of The Epc Contractor Of Duburi Chandikhole Of Nh 53 In The State Of Odisha
Organisation National Highways Authority of India | RO-Bhubaneswar - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 10000
EMD 1.87 Lakh
Tender Value 93.59 Lakh
Place
Link Login to view
Start Date September 26, 2026 00:25
End Date
Closing soon 15/10/2026

1 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Read more
Rectification works on pindwada sawroopganj section of 4l nh 14 (new nh 27)and pindwada udaipur section of 4l nh 76 (new nh 27) in the state of rajasthan on risk and cost of contractor on item rate basis

Rectification works on pindwada sawroopganj section of 4l nh 14 (new nh 27)and pindwada udaipur section of 4l nh 76 (new nh 27) in the state of rajasthan on risk and cost of contractor on item rate basis

Read more
Supervision consultant for o m for talcher to kamakhyanagar bypass and kamakhyanagar bypass duburi of nh 53 in the state of odisha

Supervision consultant for o m for talcher to kamakhyanagar bypass and kamakhyanagar bypass duburi of nh 53 in the state of odisha

Read more
Rectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis

Rectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis

Read more
Rectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis

Rectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis

Read more
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh

Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.

Read more
Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor

Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor

Read more
Rectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire

Rectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire

Read more
One time improvement of mozari town from km. 119.000 to km. 123.000 on existing nh-53 under epc mode.

One time improvement of mozari town from km. 119.000 to km. 123.000 on existing nh-53 under epc mode.

Read more
Strengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.

Strengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise