Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution Of Pothole Rectification/Filling Works Of Nh 53 At The Risk N Cost Of The Epc Contractor Of Duburi Chandikhole Of Nh 53 In The State Of Odisha
|
| Description |
Execution Of Pothole Rectification/Filling Works Of Nh 53 At The Risk N Cost Of The Epc Contractor Of Duburi Chandikhole Of Nh 53 In The State Of Odisha
|
| Organisation | National Highways Authority of India | RO-Bhubaneswar - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 10000 |
| EMD | 1.87 Lakh |
| Tender Value | 93.59 Lakh |
| Place | |
| Link | Login to view |
| Start Date | September 26, 2026 00:25 |
| End Date |
Closing soon
15/10/2026
1 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Read moreRectification works on pindwada sawroopganj section of 4l nh 14 (new nh 27)and pindwada udaipur section of 4l nh 76 (new nh 27) in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification works on pindwada sawroopganj section of 4l nh 14 (new nh 27)and pindwada udaipur section of 4l nh 76 (new nh 27) in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreSupervision consultant for o m for talcher to kamakhyanagar bypass and kamakhyanagar bypass duburi of nh 53 in the state of odisha
Supervision consultant for o m for talcher to kamakhyanagar bypass and kamakhyanagar bypass duburi of nh 53 in the state of odisha
Read moreRectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreRectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read moreExecution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Read moreRectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire
Rectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire
Read moreOne time improvement of mozari town from km. 119.000 to km. 123.000 on existing nh-53 under epc mode.
One time improvement of mozari town from km. 119.000 to km. 123.000 on existing nh-53 under epc mode.
Read moreStrengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.
Strengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.
Read moreof your Industry type