Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 01 No Of Vup With Approach Road At Km. 299.650, In Puintola To Tangi Section Of Nh 5 (New Nh 16) In The State Of Odisha On Engineering Procurement And Construction (Epc) Mode
|
| Description |
Construction Of 01 No Of Vup With Approach Road At Km. 299.650, In Puintola To Tangi Section Of Nh 5 (New Nh 16) In The State Of Odisha On Engineering Procurement And Construction (Epc) Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_224787_1 |
|
Reference Number |
NHAI/13012/153/RO/OD/212/25 |
| Tender Fee | 20000 |
| EMD | 22.23 Lakh |
| Tender Value | |
| Place | Rambha |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=251410 |
| Start Date | January 24, 2025 22:30 |
| End Date |
Expired
24/02/2025
Expired 485 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreEngagement of user fee agency through e-quotation for dumbarwadi fee plaza at km 125.700 for malshej ghat to ane ghat section at nh 222 (new nh 61) of two-lane section in the state of maharashtra
Engagement of user fee agency through e-quotation for dumbarwadi fee plaza at km 125.700 for malshej ghat to ane ghat section at nh 222 (new nh 61) of two-lane section in the state of maharashtra
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreO and m of facilities amenities (kiosk only) at maroud toll plaza (km. 45.500) on both sides (lhs-rhs) under highway nest (mini) on kodebod- dhamtari section of nh-30 in the state of chhattisgarh under the jurisdiction of piu -abhanpur
O and m of facilities amenities (kiosk only) at maroud toll plaza (km. 45.500) on both sides (lhs-rhs) under highway nest (mini) on kodebod- dhamtari section of nh-30 in the state of chhattisgarh under the jurisdiction of piu -abhanpur
Read moreof your Industry type