Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Maintenance Of All The Sldb Installed On The Each Floor Of Main Building For Lighting Control At The Ps 5 Main Building, Ps 4, Ps 8 N 9, Ps 11, Ps 14 And Also Providing N Testing Of Lighting Accessories Under Rajrappa Washery
|
| Description |
Repair Maintenance Of All The Sldb Installed On The Each Floor Of Main Building For Lighting Control At The Ps 5 Main Building, Ps 4, Ps 8 N 9, Ps 11, Ps 14 And Also Providing N Testing Of Lighting Accessories Under Rajrappa Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_297788_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/23-24/Et/119 dt 06.01.24 |
| Tender Fee | 0 |
| EMD | 4700 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=308436 |
| Start Date | January 09, 2024 00:00 |
| End Date |
Expired
17/01/2024
Expired 1003 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - erection of overhead line and cable ducting of approximately 95 metres each, along with electrical accessories and led lighting for the volleyball and kabaddi grounds at wcl umrer colony
Custom bid for services - erection of overhead line and cable ducting of approximately 95 metres each, along with electrical accessories and led lighting for the volleyball and kabaddi grounds at wcl umrer colony
Read moreOld cable dismentalling,relaying at different places in the ps-5 main building n ps-14 of rajrappa washery project.
Old cable dismentalling,relaying at different places in the ps-5 main building n ps-14 of rajrappa
 washery project.
Read moreErection of lighting arrestor n earthing of two new weighbridge (1503 and railway siding) of under rajrappa washery project.
Erection of lighting arrestor n earthing of two new weighbridge (1503 and railway siding) of under rajrappa washery project.
Read moreRepairing of 50 mt asec make electronic road weighbridge installed at rajrappa washery
Repairing of 50 mt asec make electronic road weighbridge installed at rajrappa washery
Read moreRemoving of the old damaged existing wiring and doing new fresh wiring n provide the lighting accessories in all the rooms of administrative building of rajrappa washery project.
Removing of the old damaged existing wiring and doing new fresh wiring n provide the lighting accessories in all the rooms of administrative building of rajrappa washery project.
Read moreDismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
 
Read moreRepairing of sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project
Repairing of
 sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project.
Read moreProviding, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Read moreRepairing of wagon in hauler complete with drive n winch pullies, gear boxes and winch house ps 11 under loading section of rajrappa washery project.
Repairing of wagon in hauler complete with drive n winch pullies, gear boxes and winch house ps 11 under loading section of rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreof your Industry type