Tender Details
Particulars | Details |
---|---|
Title |
Renewal Work By Pc In Km 1 And 2 Of Kathpudiachhina Seraghat Motor Road Under Annual Maintenance Work In The Financial Year 2025 26
|
Description |
Renewal Work By Pc In Km 1 And 2 Of Kathpudiachhina Seraghat Motor Road Under Annual Maintenance Work In The Financial Year 2025 26
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2950 |
EMD | 63000 |
Tender Value | |
Place | Bageshwar |
Link |
AAAAAAAAAA Login to view |
Start Date | April 16, 2025 23:10 |
End Date |
28/04/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreLong term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreTreatment of 05 nos. of landslide location (ch. 29.010 to 29.280, ch.54.840 to 54.980, ch. 56.050 to 56.140) on nh-107 and ch.70.260 to 70.340, ch.81.900 to 82.015 on nh-107a in the state of uttarakhand under annual plan 2024-2025
Treatment of 05 nos. of landslide location (ch. 29.010 to 29.280, ch.54.840 to 54.980, ch. 56.050 to 56.140) on nh-107 and ch.70.260 to 70.340, ch.81.900 to 82.015 on nh-107a in the state of uttarakhand under annual plan 2024-2025
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreCe/eap/adrhardp/corr_i/pkg.3 upgradation and 4_year maintenance of corridor1 from km 98.000_thaiplungdisa to km 122.000_dikrangso
Package no. ce/eap/adrhardp/corr_i/pkg.3&#x0d upgradation and 4-year maintenance of corridor_1 from km 98.000 (thaiplungdisa) to km 122.000_dikrangso_excluding the section from km 100.950 to km 105.400_4.450 km under adrhardp&#x0d
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreInviting annual rate tender for handpump maintenance material of ulb for the year 2025-26
Inviting annual rate tender for handpump maintenance material of ulb for the year 2025-26
Read moreof your Industry type