Tender Details

Particulars Details
Title
Engagement Of User Fee Collection Agency For Charoti Fp At Km. 420.340 On Nh 48, Six Laning Of Surat Dahisar Section Of Nh 8 From Km 263.000 To Km 502.000 (Length 239.000 Km) In Gujarat And Maharashtra
Description
Engagement Of User Fee Collection Agency For Charoti Fp At Km. 420.340 On Nh 48, Six Laning Of Surat Dahisar Section Of Nh 8 From Km 263.000 To Km 502.000 (Length 239.000 Km) In Gujarat And Maharashtra
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_173201_1
Reference
Number
NHAI/13013/547/ CO/23-24/EQ/Charoti FP
Tender Fee 0
EMD 0
Tender Value
Place NHAI HQ
Link https://etenders.gov.in
Start Date November 04, 2023 00:10
End Date

09/11/2023 ( Expired 560 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Read more
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode

Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Read more
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Read more
Construction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode

Construction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise