Tender Details
Particulars | Details |
---|---|
Title |
Belt And Wallet With Box,Paper Bag Glossy With Both Side Embosing,Sea Cap With Embroid Logo,Customi
|
Description |
|
Organisation | Department of Defence | Ministry of Defence |
Tender Id | GEM/2025/B/6063985 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 18, 2025 13:27 |
End Date |
10/04/2025 ( Expired 61 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | ARJUN DIGITAL SOLUTION | Make : Unbrand Model : NA Title : Belt and Wallet with Box | 09-04-2025 20:12:06 | N/A | Qualified |
2 | MAHABALA ENTERPRISE | Make : UNIVERSAL Model : NA Title : Belt and Wallet with Box | 09-04-2025 19:56:03 | N/A | Qualified |
3 | N G DISTRIBUTION | Make : Universal Category Model : NA Title : Belt and Wallet with Box | 09-04-2025 19:38:58 | N/A | Qualified |
4 | PRINTFRY OFFICE PRIVATE LIMITED | Make : Belt and Wallet with Box Model : Belt and wallet with box_Printfry Title : Belt and Wallet with Box | 08-04-2025 19:01:08 | N/A | Qualified |
5 | VAIRYA ENTERPRISE | Make : bunbranded Model : Belt And Wallet With Box Title : Belt and Wallet with Box | 10-04-2025 10:51:28 | MSE | Qualified |
M/o rsp (subhead vertical garden) with two year maintenances in sector-15, 16, 18 metro station pillers and kalandi kunj bridge both side. noida
M/o rsp (subhead vertical garden) with two year maintenances in sector-15, 16, 18 metro station pillers and kalandi kunj bridge both side. noida
Read moreRepairing of boom assembly with its eye hole, both side track tensioner assembly and hydraulic oil coolers with cooler louver of ck300 shovel sl. no. 764 deployed at topa ocp, kuju area.
Repairing of boom assembly with its eye hole, both side track tensioner assembly and hydraulic oil coolers with cooler louver of ck300 shovel sl. no. 764 deployed at topa ocp, kuju area.
Read moreRepairing/replacement of safety glass along with aluminium frames (both side), cabin door, operator and helper seat, walkway railings and platformer of bh-35-2 dumper sl no-35225 and 35226
Repairing/replacement of safety glass along with aluminium frames (both side), cabin door, operator and helper seat, walkway railings and platformer of bh-35-2 dumper sl no-35225 and 35226
Read moreRepairing and complete replacment of sproket shaft with serviceable shaft and both side sproket mounting holes making with material filling and fitment, chain cutting, fitting and welding work of bd355 dozer sl. no. 13781
Repairing and complete replacment of sproket shaft with serviceable shaft and both side sproket mounting holes making with material filling and fitment, chain cutting, fitting and welding work of bd355 dozer sl. no. 13781
Read moreRepairing of both side lift cylinder, making of eye and replacement of worn out brake liner with rivets and partial repairing and reinforcement of blade assy. of bd155 dozer sl.no. 13591 of religara project.
Repairing of both side lift cylinder, making of eye and replacement of worn out brake liner with rivets and partial repairing and reinforcement of blade assy. of bd155 dozer sl.no. 13591 of religara project.
Read moreAiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.
Aiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.
Read moreRepairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read more1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreSupply and installation of 04 nos. jetting pipe with joint flange both side and 2 nos. sluice valve for 01 no. 1000 gpm pontoon pump at quarry no. 06 of religara ocp
Supply and installation of 04 nos. jetting pipe with joint flange both side and 2 nos. sluice valve for 01 no. 1000 gpm pontoon pump at quarry no. 06 of religara ocp
Read moreSupply, installation and commissioning of road signal flasher light with post beside road on both side of 03 nos. railway crossing at chp
Supply, installation and commissioning of road signal flasher light with post beside road on both side of 03 nos. railway crossing at chp
Read moreof your Industry type