Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
G.P Office Electrification By Solar System
|
| Description |
G.P Office Electrification By Solar System
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2025_ZPHD_831085_1 |
|
Reference Number |
8(E)/HAGP/2024-25 |
| Tender Fee | 500 |
| EMD | 7000 |
| Tender Value | - |
| Place | Adardih |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1850835 |
| Start Date | March 26, 2025 16:30 |
| End Date |
Expired
08/04/2025
Expired 537 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Providing of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Read moreRestoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa
Restoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa
Read moreRestoration and comprehensive development of ameenpur lake (phase-i) by the o/o commissioner, hydraa
Restoration and comprehensive development of ameenpur lake (phase-i) by the o/o commissioner, hydraa
Read moreRestoration and comprehensive development of amber cheruvu (phase - i) by the o/o commissioner, hydraa
Restoration and comprehensive development of amber cheruvu (phase - i) by the o/o commissioner, hydraa
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreRestoration and comprehensive development of saroor nagar lake (phase-i) by the o/o commissioner, hydraa
Restoration and comprehensive development of saroor nagar lake (phase-i) by the o/o commissioner, hydraa
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreof your Industry type