Tender Details

Particulars Details
Title
Shifting Of Existing Lt Over Head Line To Underground Cable From Digambar Parkhi To Santosh Parkhi House At Parkhiwasti In Maan Grampanchayat
Description
Shifting Of Existing Lt Over Head Line To Underground Cable From Digambar Parkhi To Santosh Parkhi House At Parkhiwasti In Maan Grampanchayat
Organisation RDD-CEO-PUNE | State Govt. and UT
Tender Id 2025_RDPUN_1132883_1
Reference
Number
GPMAAN/14-2024-25-01
Tender Fee 1680
EMD 12221
Tender Value
Place GRAMPANCHAYAT MAAN AS PER NIT
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1974809
Start Date January 03, 2025 16:30
End Date

16/01/2025 ( Expired 142 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Read more
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more

Balance work of rehabilitation and up-gradation of section from km 206.00 to km 239.445 (nimbutala to austin creek) of nh-04 in a n islands on epc basis (pkg-iv) at the risk and cost of existing epc contractor, on percentage rate basis in fy 25-2

Read more
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise