Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
24 Station Rope Gallows
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5200132 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 12, 2024 17:23 |
| End Date |
Expired
03/10/2024
Expired 720 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Restoration and conservation of old zanana wall at kachiguda railway station (3rd call).
Restoration and conservation of old zanana wall at kachiguda railway station (3rd call).
Read moreRblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreGodavari pushkaralu-2027-road to b/w of nh63(sub station) haritha hotel via smashana vatika in dharmapuri muncipality (80ft road) of jagitial district est.cost.rs.600.00 lakhs
Godavari pushkaralu-2027-road to b/w of nh63(sub station) haritha hotel via smashana vatika in dharmapuri muncipality (80ft road) of jagitial district est.cost.rs.600.00 lakhs
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreHiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Hiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreHorizontal rope station 08 rope gallows,horizontal rope area 08 rope gallows,vertical rope station
Read more
of your Industry type