Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Btps Tggenco
|
| Description |
Btps Chp Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Tail End, Head End, Along The Bcn 7 A/B, 6 A/B, Bunkers Floor And Tp 5 Area By Head Loads On To Running Conveyor And Removal Of Coal At Each Floor Of 6 A/B, 7 A/B Take Up Pulley Structure From 01.12.2024 Or Actual Date Of Commencement Of Work To 31.03.2025
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 554281 |
|
Reference Number |
e-41/2024-25 of CE/Const/BTPS(SE/CHP/BTPS) |
| Tender Fee | 529 |
| EMD | 22410 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | November 12, 2024 01:30 |
| End Date |
Expired
26/11/2024
Expired 692 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreCylinder head assy 16 valve mpfi gpsy,crank shaft mpfi for gypsy,crank shaft timming gear with cotter,main bearing big end bearing std,thrust washer std,valve seat inlet and exhaust,crank shaft fastner size 17 no,radiator fan nut size 10 no,watetr reservior plastic,uj cross propeller shaft,wiper blade set for gypsy,fog light assy for gypsy,map sensor for gypsy,idle motor for gypsy,cam sensor for gypsy,crank sensor for gypsy,rear view glash,door hinges front 4 pieces,tail gate hinge for gypsy,white duco paint for gypsy,black paint for gypsy,door beeding complete,sun shade front,floor vent rubber,dash box cover,foot matrs black,tail board stopper wire,jotun mixer,tata 410 ex front both side indicator,side parking light,uj cross propeller shaft,wiper arm with blade,paint grey khakhi colour,both side reer view glash,brake shoe with rebets front and rear,side body upper indicator glass,car creper trolly 40 inch,tata 709 truck wiper blade set,door machine reglater,clutch booster tata 709,enfield bulet engine filter
Cylinder head assy 16 valve mpfi gpsy,crank shaft mpfi for gypsy,crank shaft timming gear with cotter,main bearing big end bearing std,thrust washer std,valve seat inlet and exhaust,crank shaft fastner size 17 no,radiator fan nut size 10 no,watetr reservior plastic,uj cross propeller shaft,wiper blade set for gypsy,fog light assy for gypsy,map sensor for gypsy,idle motor for gypsy,cam sensor for gypsy,crank sensor for gypsy,rear view glash,door hinges front 4 pieces,tail gate hinge for gypsy,white duco paint for gypsy,black paint for gypsy,door beeding complete,sun shade front,floor vent rubber,dash box cover,foot matrs black,tail board stopper wire,jotun mixer,tata 410 ex front both side indicator,side parking light,uj cross propeller shaft,wiper arm with blade,paint grey khakhi colour,both side reer view glash,brake shoe with rebets front and rear,side body upper indicator glass,car creper trolly 40 inch,tata 709 truck wiper blade set,door machine reglater,clutch booster tata 709,enfield bulet engine filter
Read moreEtimate for removal spilled coal bcn 25
Removal of spilled over coal, fine dust powder , wet and chocked coal in bcn25, reclaimer 2, stacker 2 and tp7 i.e bcn25 te to he at tp7 , stacker2, reclaimer2 all floors in chp ytps 5x800mw for 91 days from 01.04.2026 or actual date of commencement of work
Read moreRe-handling of spilled coal/slim from surrounding areas of unit no. 303, 304 belt conveyor tail end and head end and 307, 308 shuttle conveyor and surrounding floor areas of 4.00mtr. of main plant of kedla washery.
Re-handling of spilled coal/slim from surrounding areas of unit no. 303, 304 belt conveyor tail end and head end and 307, 308 shuttle conveyor and surrounding floor areas of 4.00mtr. of main plant of kedla washery.
Read moreRe-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.
Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.
Read moreRe-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.
Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.
Read moreRe-handling of spilled coal around 122 belt conveyor gallery and surrounding area and around gallery, head and tail end surrounding area of 123 belt conveyor of kedla washery.
Re-handling of spilled coal around 122 belt conveyor gallery and surrounding area and around gallery, head and tail end surrounding area of 123 belt conveyor of kedla washery.
Read moreRepair and maintenance of iron removal plant and filteration plant of pump houses of zone 7a, 7b, 8, 9, 10 and cleaning of ug/over head reservoir under ge (n) tezpur
Repair and maintenance of iron removal plant and filteration plant of pump houses of zone 7a, 7b, 8, 9, 10 and cleaning of ug/over head reservoir under ge (n) tezpur
Read moreShifting of gate end box, drill panels, drill machine and support of cables within the district for 4j-6a and 4j-7a depillaring panel during retreating of pillars due to extraction in 4a seam at jhiria ug mine.
Shifting of gate end box, drill panels, drill machine and support of cables within the district for 4j-6a and 4j-7a depillaring panel during retreating of pillars due to extraction in 4a seam at jhiria ug mine.
Read moreRepairing, replacement of structures of ground floor of transfer point 1104 and tail end to head end of conveyors 1016 and 1017 under chp/cpp, piparwar area.
Repairing, replacement of structures of ground floor of transfer point 1104 and tail end to head end of conveyors 1016 and 1017 under chp/cpp, piparwar area.
Read moreof your Industry type