Tender Details
| Particulars | Details |
|---|---|
| Title |
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Tail End, Headend, Along The Bcn 4 A/B, 5 A/B, Bcn 10, Tp 3, Tp 4, 6 A/B Tail End And Erh Area By Head Loads On To Running Conveyor From 01.12.2026 Or Actual Date Of Utilization To 31.03.2027 Required In Mm Iii Subdivision Of Mm/Chp/Btps.
|
| Description |
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Tail End, Headend, Along The Bcn 4 A/B, 5 A/B, Bcn 10, Tp 3, Tp 4, 6 A/B Tail End And Erh Area By Head Loads On To Running Conveyor From 01.12.2026 Or Actual Date Of Utilization To 31.03.2027 Required In Mm Iii Subdivision Of Mm/Chp/Btps.
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | Telangana |
| Link | Login to view |
| Start Date | November 10, 2026 02:30 |
| End Date |
Open
16/11/2026
6 days left |
Bidding on this tender?
Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.
Can't bid on this alone?
Short of the turnover, experience or certification it asks for, or need a team where the work is? We'll find a JV, consortium or local partner.
Find a partner →Get tenders for your business
Tell us what you supply or do. We'll send you matching tenders and call you about them.
Free tender checklists for your industry →Similar Tenders
-
Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the bcn-7a/b, 6a/b head end, 6a/b gallery, bunker floor and tp-5 area by head loads on to running conveyor from 01.12.2026 or from actual date of commencement of work to 31.03.2027 required in mm-iii subdivision of mm/chp/btps.
TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS · Telangana Closes 16/11/2026
View tender -
Removal of spilled over coal, fine dust and wet coal of bcn-1a/b tunnel along the conveyor, tp-1 including fg-3 and 4 floor, mh-2, module-1 to 10 and tail end area at mh-1 including hgtu by head loads on to running conveyor, apron feeder floor and bcn-2ab tunnel including fg-1 and 2 floor by head loads on to running conveyor required in mm/chp/btps from 01.12.2026 or actual date of commencement of work to 31.03.2027.
TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS · Telangana Closes 16/11/2026
View tender -
Removal of spilled over coal and fine dust at crusher house floors by head loads on to running conveyor from 01.12.2026 or actual date of commencement to 31.03.2027 required in mm-ii subdivision of mm/chp/btps.
TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS · Telangana Closes 16/11/2026
View tender -
Removal of spilled over coal, fine dust and wet coal of bcn-3a/b tunnel, fg-5 and 6 floor at tp-2, ground portal, gallery and head end areas and contingency- 1 and 2 area of 3a/b including fg floors and reclaim belt conveyors and ground reclaim chain feeders by head loads on to running conveyor feeders from 01.12.2026 or actual date of commencement of work to 31.03.2027 required in mm-i subdivision of mm/chp/btps.
TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS · Telangana Closes 16/11/2026
View tender -
Extension and barricading of tail end areas walkways of bcn-12a,b for safe movement, fabrication, erection 05 no stone-picking stands at bcn-22a,b and bcn-7 at chp
Government of West Bengal · Adm. Building SgTPP PO Manigram Dist Murshidabad Closed 07/08/2023
View tender -
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS · Telangana Closed 22/10/2026
View tender -
Cleaning of spilled coal below tail ends/discharge ends of lhcm 33ls panel in seam a at kurja ug mine.
South Eastern Coalfields Limited | Public Sector Undertakings · Hasdeo Area Closed 21/02/2024
View tender -
Cleaning of spilled coal below tail ends/discharge ends of proposed lhcm dep. panel in seam a at kurja sheetaldhara ug mine of hasdeo area.
South Eastern Coalfields Limited | Public Sector Undertakings · Hasdeo Area Closed 31/01/2024
View tender -
Cleaning of spilled coal below tail ends/discharge ends of lhcm south side panel from main dip panel in seam a at kurja ug mine.
South Eastern Coalfields Limited | Public Sector Undertakings · Hasdeo Area Closed 21/02/2024
View tender -
Re-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery
Central Coalfields Limited | Public Sector Undertakings · KEDLA WASHERY Closed 06/03/2025
View tender