Tender Details

Particulars Details
Title
New Plantation (Campa Scheme) In Hisar 1 Block
Description
New Plantation (Campa Scheme) In Hisar 1 Block
Organisation Haryana Government | State Govt. and UT
Tender Id 2025_HRY_447716_1
Reference
Number
Tender No. 47/2025-26
Tender Fee 2180
EMD 26459
Tender Value
Place Hisar Range
Link https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=525204
Start Date May 19, 2025 21:30
End Date

28/05/2025 ( Expired 34 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
Development, operation and maintenance of wayside amenities on different sections of national highway on lease basis in madhya pradesh (dbot - 1 site)nh-44/gwalior-jhansi-road

Development, operation and maintenance of wayside amenities on different sections of national highway on lease basis in madhya pradesh (dbot - 1 site)nh-44/gwalior-jhansi-road/km 112-000/dabra/mp

Read more
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more

Rehabilitation and restoration of tarafeni barrage and its appurtenant structures civil, electro-mechanical and instrumentation part under kangsabati project in right bank canal system at mouza and village baistampur, block binpur ii, p.s. belpahari

Read more
Btps(4x270mw)

Design, engineering, manufacture, supply, assembly, testing at manufacturers works, inspection, packing for inland freight, forwarding, transit insurance, delivery for site, erection, supervision, testing and commissioning of new conveying system for di of raw coal including modification works in the existing crusher house and construction of space frame structure raw coal storage shed with all accessories, mandatory spares, tools and tackles including all mechanical, electrical, cni, civil, structural works, dust suppression, dust extraction and fire fighting system at btps(4x270mw) project.

Read more
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise