Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation In Trenches Not Exc 1 Point 5m Wide,Returning Filling In Soil Including Spreading Leveli
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4726937 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 08, 2024 23:24 |
| End Date |
Expired
12/03/2024
Expired 949 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | BHAGVATI KRUPA ENTERPRISE | - | 10-03-2024 14:52:59 | MSE | Qualified |
| 2 | NIPAR CONSULTANCY SERVICES | - | 12-03-2024 12:04:20 | MSE | Qualified |
| 3 | NIPAR FINANCIAL SERVICES PVT LTD | - | 12-03-2024 11:34:29 | MSE | Qualified |
| 4 | RUDRAVEER ELECTROMECH PROJECTS PRIVATE LIMITED | - | 12-03-2024 18:58:13 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | BHAGVATI KRUPA ENTERPRISE(MSE)( MSE Social Category:General ) | Item Categories : Excavation in trenches not exc 1 point 5m wide,Returning filling in soil including spreading leveli | 79986.00 | L1 |
| 2 | NIPAR CONSULTANCY SERVICES (MSE)( MSE Social Category:General ) | Item Categories : Excavation in trenches not exc 1 point 5m wide,Returning filling in soil including spreading leveli | 86565.00 | L2 |
| 3 | NIPAR FINANCIAL SERVICES PVT LTD (MSE)( MSE Social Category:General ) | Item Categories : Excavation in trenches not exc 1 point 5m wide,Returning filling in soil including spreading leveli | 87975.00 | L3 |
| 4 | RUDRAVEER ELECTROMECH PROJECTS PRIVATE LIMITED (MSE)( MSE Social Category:OBC ) | Item Categories : Excavation in trenches not exc 1 point 5m wide,Returning filling in soil including spreading leveli | 109860.00 | L4 |
Dismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Dismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreSurface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreExcavation in trenches in soft and loose soil,returning, filling in including spreading leveling wa
Read more
of your Industry type