Tender Details

Particulars Details
Title
Excavation In Trenches,Returning Filling In,Removal Of Surplus Soil,Supply Laying And Spreading Of
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/5213600
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date July 26, 2024 23:59
End Date
Expired 16/08/2024

Expired 788 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 1 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 A.I. ENTERPRISES - 01-08-2024 21:13:31 MSE Qualified
2 GEM SHOPPERS STOP - 02-08-2024 18:06:56 MSE Qualified
3 M/S A SQUARE CONSTRUCTION COMPANY - 01-08-2024 18:31:38 MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 M/S A SQUARE CONSTRUCTION COMPANY(MSE)( MSE Social Category:OBC ) Item Categories : Excavation in trenches,Returning filling in,Removal of surplus soil,Supply laying and spreading of 259050.00 L1
2 A.I. ENTERPRISES (MSE)( MSE Social Category:OBC ) Item Categories : Excavation in trenches,Returning filling in,Removal of surplus soil,Supply laying and spreading of 261195.00 L2
3 GEM SHOPPERS STOP (MSE)( MSE Social Category:OBC ) Item Categories : Excavation in trenches,Returning filling in,Removal of surplus soil,Supply laying and spreading of 281035.00 L3
Similar Tenders
Excavation of pits/ trenches for water supply pipeline repair and maintenance works

Excavation of pits/ trenches for water supply pipeline repair and maintenance works

Read more
Providing and spreading soil for extinguishing fire at 4th cell turbhe landfill site.

Providing and spreading soil for extinguishing fire at 4th cell turbhe landfill site.

Read more
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha

Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Construction of balance central media , soil filling and plantation work below metro line

Construction of balance central media , soil filling and plantation work below metro line

Read more
Earth filling(replacement of existing soil upto 4m) for the archagar and staff quarters

Earth filling (replacement of existing soil upto 4m) for the archagar and staff quarters belong to arulmigu raveeswarar, temple,vyasarpadi, chennai

Read more
Provision of raising plateform of firing range and soil filling and pol store at armoury at 24 ed

Provision of raising plateform of firing range and soil filling and pol store at armoury at 24 ed

Read more
Construction of a boundary wall in ward no 08 following the filling of the government garahi with soil

Construction of a boundary wall in ward no 08 following the filling of the government garahi with soil

Read more
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul

Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise