Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation In Trenches,Returning Filling In,Removing Surplus Excavated Material,Material And Labour
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4564190 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 01, 2024 19:34 |
| End Date |
Expired
12/02/2024
Expired 974 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Crompton Briz Air Deco 1200mm Lustre Brown | crompton | Crompton Briz Air Deco 1200mm Lustre Brown | 12 | ₹ 28800.000 |
| NOTICE BOARD | NA | NA | 4 | ₹ 4600.000 |
| Samsung MLT-D203S Black Toner Cartridge | SAMSUNG | Samsung MLT-D203S Black Toner Cartridge | 60 | ₹ 333600.000 |
| file cover with printing | AU | file cover with printing | 300 | ₹ 3000.000 |
| SIMMTRONICS 2GB | Simmtronics | SIMMTRONICS 2GB DDR2 | 14 | ₹ 14000.000 |
| File Tag Green | Unbranded | File Tag Green-v18 | 372 | ₹ 49848.000 |
| Microsoft Officestd 2016 SNGL OLP C | Microsoft | Microsoft & Officestd 2016 SNGL OLP C | 1 | ₹ 14800.000 |
| Electrical Wire 4mm Bundle 90M | finolex | 4m-CU-AL | 6 | ₹ 37800.000 |
| SURF EXCEL EASY WASH | surf excel | SURF EXCEL BLUE | 15 | ₹ 1638.750 |
| MULTIMEDIA PROJECTOR | Hitachi | HITACHI CP-X2542WN | 1 | ₹ 37280.000 |
| hp desktop | hp | HP Slimline 270-p020il | 2 | ₹ 64798.000 |
| GODREJ COMPUTER TABKE C11 | GODREJ INTERIO | GODREJ COMPUTER TABKE C11 | 2 | ₹ 17560.000 |
| CDMA Trainer | Tatame | Tatame TTCDMATR | 1 | ₹ 49990.000 |
| MEDICAL REIMBURSEMENT CLAIM FORM | PARAS | PARAS MEDICAL REIMBURSEMENT CLAIM FORM | 10 | ₹ 950.000 |
| best and more reliable weighing scale | Omron | hn289 omron | 25 | ₹ 49999.750 |
| Carrier split AC | Carrier | CAS18DF3N8F0/2018 | 1 | ₹ 37850.000 |
| File wrapper or flap | NA | wrapper | 600 | ₹ 2580.000 |
| file cabinet four drawer (NV) | N.V. | NV-FC-001 | 1 | ₹ 8900.100 |
| HP 204A Cyan LaserJet Toner Cartridge CF511A | hp | HP 204A Cyan LaserJet Toner Cartridge CF511A | 2 | ₹ 6986.000 |
| HP 204A Yellow LaserJet Toner Cartridge CF512A | hp | HP 204A Yellow LaserJet Toner Cartridge CF512A | 2 | ₹ 6986.000 |
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Read moreEarth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Read moreSale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Read moreProvision of an additional passenger waiting shelter at the east side of arani temporary bus stand and filling of the waterlogged surface with excavated earth
Provision of an additional passenger waiting shelter at the east side of arani temporary bus stand and filling of the waterlogged surface with excavated earth
Read moreEarthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Read moreAnnual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win
Annual clearance of road berm upto premix top level, removing of unwanted excavated earth wet silt from berm and side drains deep drains having road length of different carriage way 11km cleaning of premises around estate civilelect wi
Read moreAnnual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win
Annual clearance of road berm upto premix top level, removing of un-wanted excavated earth wet silt from berm, deep drains (having road length of different carriage way 15km., surface drains offices including green belt/parks at ie khonmoh
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreWork contract for excavation, loading, transportation and unloading of the ash from ash dyke ii of sgtps, birsinghpur, distt. umaria m.p. to private land no. 1130 s owned by shri sanjeev khandelwal, ward no.11 birsinghpur pali for filling subsid
Work contract for excavation, loading, transportation and unloading of the ash from ash dyke ii of sgtps, birsinghpur, distt. umaria m.p. to private land no. 1130 s owned by shri sanjeev khandelwal, ward no.11 birsinghpur pali for filling subsid
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type