Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation In Trenches,Returning Filling In Including Spreading Leveling,Removing Of Excavated Mate
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/B/6071294 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 10, 2025 18:15 |
| End Date |
Expired
31/05/2025
Expired 501 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Read moreEarth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Read moreCarriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Carriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Read moreSale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Read moreProvision of an additional passenger waiting shelter at the east side of arani temporary bus stand and filling of the waterlogged surface with excavated earth
Provision of an additional passenger waiting shelter at the east side of arani temporary bus stand and filling of the waterlogged surface with excavated earth
Read moreSite cleaning and leveling,soil filling and manure mixing,lawn grass supply and installation,decorative plants and flowering shrubs,big tree plantation,drip irrigation system,labor installation and finishing
Site cleaning and leveling,soil filling and manure mixing,lawn grass supply and installation,decorative plants and flowering shrubs,big tree plantation,drip irrigation system,labor installation and finishing
Read moreEarthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreAnnual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win
Annual clearance of road berm upto premix top level, removing of unwanted excavated earth wet silt from berm and side drains deep drains having road length of different carriage way 11km cleaning of premises around estate civilelect wi
Read moreAnnual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win
Annual clearance of road berm upto premix top level, removing of un-wanted excavated earth wet silt from berm, deep drains (having road length of different carriage way 15km., surface drains offices including green belt/parks at ie khonmoh
Read moreof your Industry type