Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Accumulated Earth From Chaprayil Kettinakam Thodu And Guruvaram Bhagam Thodu In Ward No 2 Of Thrikunnapuzha Gp
|
| Description |
Removal Of Accumulated Earth
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_673608_1 |
|
Reference Number |
IRR/KP/TR/3806/2024_5_1_1/2 |
| Tender Fee | 555 |
| EMD | 4462 |
| Tender Value | - |
| Place | Thrikunnapuzha |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1047764 |
| Start Date | May 27, 2024 14:30 |
| End Date |
Expired
30/05/2024
Expired 869 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual plan-2026-27 kanjirappally block (project no 46/27)- koppam thodu protection nirmal bhagam thumarampara chappath bhagam protection wall -general civil work
Annual plan-2026-27 kanjirappally block (project no 46/27)- koppam thodu protection nirmal bhagam thumarampara chappath bhagam protection wall -general civil work
Read moreGeneral-kannankara thodu cleaning- premonsoon 2026-27 - urgent removal of deposited silt and debris from the mouth of kannankara thodu towards achenkovil river in pathanamthitt muncipality .-general civil work
Work is proposed to remove the accumulated silt and debris in the mouth portion of kannankara thodu near to achankovil river.
Read moreFlood mitigation works of cleaning and debris removal of blockages and accumulated silt from valvanti river near shree devi temple shiroli keri in poriem constituency
Flood mitigation works of cleaning and debris removal of blockages and accumulated silt from valvanti river near shree devi temple shiroli keri in poriem constituency
Read moreRemoval of earth to restore the capacitiy of narasinganallur tank in narasinganallur village of tirunelveli taluk in tirunelveli district
Removal of earth to restore the capacitiy of narasinganallur tank in narasinganallur village of tirunelveli taluk in tirunelveli district
Read moreAnnual plan-pkda bp s0142/27 construction of side protection wall after earth removal near canteen-pampakuda bpgeneral civil work
Annual plan-pkda bp s0142/27 construction of side protection wall after earth removal near canteen-pampakuda bpgeneral civil work
Read moreTtpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Ttpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreRemoval of accumulated earth from chaprayil kettinakam thodu and guruvaram bhagam thodu in ward no. 2 of thrikunnapuzha gp
Removal of accumulated earth
Read moreRemoval of accumulated earth and hyacinth from kannuchal puthuval punnaprappadi thodu
Emergency monsoon&#x0d preparedness 2025--removal of&#x0d accumulated earth and hyacinth from&#x0d kannuchal puthuval punnaprappadi thodu in&#x0d ward no.2 of cheruthana panchayath-general&#x0d civil work
Read moreof your Industry type