Tender Details
Particulars | Details |
---|---|
Title |
Repair Restoration Of 7.5 Hp, 3 Phase, 415 V, 1450 Rpm, 50 Hz, Dewatering Pump By Way Of Replacement Of Damaged Worn Out Parts Installed In Machine Hall Including Repairing Of 4 Nos. Of Induction Motors
|
Description |
Repair Restoration Of 7.5 Hp, 3 Phase, 415 V, 1450 Rpm, 50 Hz, Dewatering Pump By Way Of Replacement Of Damaged Worn Out Parts Installed In Machine Hall Including Repairing Of 4 Nos. Of Induction Motors
|
Organisation | JKSPDC | State Govt. and UT |
Tender Id | 2025_SPDC_271238_1 |
Reference Number |
GTD/PDC/TS/20 of 2024-25 |
Tender Fee | 100 |
EMD | 1500 |
Tender Value | |
Place | Pahalgam Power House |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=838584 |
Start Date | February 01, 2025 19:30 |
End Date |
13/02/2025 ( Expired 90 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing, levelling, alignment of eot crane supporting gantry girder along with replacement of worn out travelling pathway rail, removal and replacement of old damaged conductor type dsl, by new shrouded type dsl of 03 no. eot crane at crs, barkaka
Repairing, levelling, alignment of eot crane supporting gantry girder along with replacement of worn out travelling pathway rail, removal and replacement of old damaged conductor type dsl, by new shrouded type dsl of 03 no. eot crane at crs, barkaka
Read moreTender for repair overhauling alongwith replacement of defective damaged parts of 02 no 50 hp submersible pump flow more and mody make for 3x42 mw larji power house under resident engineer larji power house division hpsebl, thalout.
Tender for repair overhauling alongwith replacement of defective damaged parts of 02 no 50 hp submersible pump flow more and mody make for 3x42 mw larji power house under resident engineer larji power house division hpsebl, thalout.
Read moreRepairing/rewinding of ac generator 35 kva, 3 phase, 415v, 50 hz, sl no. 98e33500-45, make - kirloskar electric installed on tmc (up64 at 2642) at bina project
Repairing/rewinding of ac generator 35 kva, 3 phase, 415v, 50 hz, sl no. 98e33500-45, make - kirloskar electric installed on tmc (up64 at 2642) at bina project
Read more- replacement of damaged pump by new 7.5 hp open well submersible pump in u/g reservoir for lifting of hard water reservoir to over head tanks at 82, balygaunge place under bsnl esd-vii, ctd, kolkata..
- replacement of damaged pump by new 7.5 hp open well submersible pump in u/g reservoir for lifting of hard water reservoir to over head tanks at 82, balygaunge place under bsnl esd-vii, ctd, kolkata..
Read moreRepairing and part rewinding of one no. 3.3 kv, 350 kw, 1490 rpm, marathon electric make, sr. no. f330123 by 1, three phase induction motor, installed in mine at karo ocp, under bnk area
Repairing and part rewinding of one no. 3.3 kv, 350 kw, 1490 rpm, marathon electric make, sr. no. f330123 by 1, three phase induction motor, installed in mine at karo ocp, under bnk area
Read moreComplete repairing rewinding of stator of 75kw, 3 phase, 415v motor, 1480 rpm, make crompton greaves, sl. no. arl 531 installed at main sump and repairing rewinding of 02 nos. of stator of 22kw, 415v, 38a, 1465 rpm induction motor
Complete repairing rewinding of stator of 75kw, 3 phase, 415v motor, 1480 rpm, make crompton greaves, sl. no. arl 531 installed at main sump and repairing rewinding of 02 nos. of stator of 22kw, 415v, 38a, 1465 rpm induction motor
Read moreReplacement of existing defective 7.5 hp open well submersible pump with new and other allied work to be carried out in gwyer hall , university of delhi
Replacement of existing defective 7.5 hp open well submersible pump with new and other allied work to be carried out in gwyer hall , university of delhi
Read moreRepairing of 02 nos. submersible pump 12.5 hp and rewinding/repairing of its motor and 2 no. submersible pump and 2 nos. motors of 7.5 hp and 02 no. submersible pump at dugda coal washery township.
Repairing of 02 nos. submersible pump 12.5 hp and rewinding/repairing of its motor and 2 no. submersible pump and 2 nos. motors of 7.5 hp and 02 no. submersible pump at dugda coal washery township.
Read more(1) replacing the damaged cgi sheets at substations of asgkcc and leak repairing of pipe line,kcc.(2) replacement of damaged winding rope of 200 hp submersible pump by lifting of pump at 2 pit kcc,under agkcc.katras area.(3) lowering and lifting of 1
(1) replacing the damaged cgi sheets at substations of asgkcc and leak repairing of pipe line,kcc.(2) replacement of damaged winding rope of 200 hp submersible pump by lifting of pump at 2 pit kcc,under agkcc.katras area.(3) lowering and lifting of 1
Read moreRepairing and rewinding of 110 hp. 440v three phase induction motor installed with pump no. 3 at harina boosting under jwtp under block-ii area
Repairing and rewinding of 110 hp. 440v three phase induction motor installed with pump no. 3 at harina boosting under jwtp under block-ii area
Read moreof your Industry type