Tender Details
Particulars | Details |
---|---|
Title |
Mechanical Assistance With Manpower For Cleaning Of Oversize Coal/Shale Lump, Slush, Overflown Materials Etc. From The Trs 2 And Trs 3 Of Chp Phase Ii/ Other Related Works At Chp, Kocp For A Period Of 360 Days.
|
Description |
Mechanical Assistance With Manpower For Cleaning Of Oversize Coal/Shale Lump, Slush, Overflown Materials Etc. From The Trs 2 And Trs 3 Of Chp Phase Ii/ Other Related Works At Chp, Kocp For A Period Of 360 Days.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_322726_1 |
Reference Number |
SECL/GM/KSM/EnM/ e-Tender/24-25/87 |
Tender Fee | 0 |
EMD | 74900 |
Tender Value | |
Place | KUSMUNDA OPEN CAST PROJECT |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334516 |
Start Date | December 06, 2024 15:30 |
End Date |
21/12/2024 ( Expired 171 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for cleaning, sweeping of office and assistance in day-to-day office related works of o/o the addl. c.e.(construction) and o/o the s.e(emc)-i and s.e(emc)-ii 2x660mw, sstpp, mppgcl, dongalia for a period of 12 months.
Work contract for cleaning, sweeping of office and assistance in day-to-day office related works of o/o the addl. c.e.(construction) and o/o the s.e(emc)-i and s.e(emc)-ii 2x660mw, sstpp, mppgcl, dongalia for a period of 12 months.
Read moreNctps ii 2 x 600 mw operation circle chemical division time bound works operational and testing assistance to coal lab and quality checking of various chemicals for a period of 308 days from 28 05 2025 to 31 03 2026
Nctps ii 2 x 600 mw operation circle chemical division time bound works operational &#x0d and testing assistance to coal lab and quality checking of various chemicals for a period of 308 &#x0d days from 28 05 2025 to 31 03 2026&#x0d
Read moreAssistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Assistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Read moreAnnual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months
Annual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreCleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreE.l.d.c.no.sm ii/p10/ 506/2025 hiring of manpower electrical helper 32 persons for electrical works in zone x areas for a period of 6 months 180 days through private agency
E.l.d.c.no.sm ii/p10/ 506/2025 &#x0d hiring of manpower electrical helper 32 persons for electrical works in zone x areas for a period of 6 months 180 days through private agency &#x0d
Read moreof your Industry type