Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning Of Spillage/ Overflown/Jammed Coal, Slush, Slurry Etc. Around Various Belt Conveyors Of New Chp Phase I, Kusmunda Project.
|
| Description |
Cleaning Of Spillage/ Overflown/Jammed Coal, Slush, Slurry Etc. Around Various Belt Conveyors Of New Chp Phase I, Kusmunda Project.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_SECL_287955_1 |
|
Reference Number |
SECL/GM/KSM/EnM/ eTender/23-24/25 |
| Tender Fee | - |
| EMD | 86300 |
| Tender Value | - |
| Place | OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 07, 2023 16:30 |
| End Date |
Expired
22/09/2023
Expired 1119 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Belt monitoring system for critical conveyors of chp unit1&2.
Supply, erection & commissioning of belt monitoring system for critical conveyors of chp.
Read moreCustom bid for services - cleaning of coal spillage from trunk gate and pony belt conveyors at naheriya underground mine of pench area
Custom bid for services - cleaning of coal spillage from trunk gate and pony belt conveyors at naheriya underground mine of pench area
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreCleaning of spillage/overflown/jammed coal, slush, slurry, etc. around various belt conveyors of new chp phase i, kusmunda project.
Cleaning of spillage/overflown/jammed coal, slush, slurry, etc. around various belt conveyors of new chp phase i, kusmunda project.
Read moreFacility management services - lump sum based - industrial; cleaning of spillage coal slush slurry
Read more
Facility management services - lumpsum based - industrial; cleaning of spillage coal slush slurry e
Read more
Regular cleaning of spillage coal dust/slush/slurry etc including feeder breakers,associated secondary crushers and belt conveyors,steel bunkers etc of all running feeder breaker circuit at mini chp for a period of 180days at dipka expansion project.
Regular cleaning of spillage coal dust/slush/slurry etc including feeder breakers,associated secondary crushers and belt conveyors,steel bunkers etc of all running feeder breaker circuit at mini chp for a period of 180days at dipka expansion project.
Read moreCleaning of spillage coal, slush and slurry in different conveyor area, control room and silo at new chp under s b area
Cleaning of spillage coal, slush and slurry in different conveyor area, control room and silo at new chp under s b area
Read moreof your Industry type