Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of P.C.C. Road From The House Of Prafulla Roy To The House Of Jogesh Roy Under Dhangdhinguri
|
| Description |
Construction Of P.C.C. Road From The House Of Prafulla Roy&Amp#X0d
To The House Of Jogesh Roy Under Dhangdhinguri
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_790787_1 |
|
Reference Number |
NIT 19/DDG/24 |
| Tender Fee | 500 |
| EMD | 4515 |
| Tender Value | - |
| Place | NAGESWARGURI |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1754023 |
| Start Date | December 27, 2024 00:25 |
| End Date |
Expired
02/01/2025
Expired 628 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Laying of cc road from satyanarayana house to pavan house satyanarayana house to raji reddy house in road no 3 and sravan kumar house to makolu mallaiah house in road no 1 in green city colony ward no 12 chengicherla of boduppal circle 10 upz mmc
Laying of cc road from satyanarayana house to pavan house satyanarayana house to raji reddy house in road no 3 and sravan kumar house to makolu mallaiah house in road no 1 in green city colony ward no 12 chengicherla of boduppal circle 10 upz mmc
Read more1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
Read more1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreProcurement of di(k7) pipes for the sanctions obtained from the month of april-2026 to july-2026 at sahebnagar stores, sub division-iv, under central stores division. estimate no.est-sbn-202600067
Procurement of di(k7) pipes for the sanctions obtained from the month of april-2026 to july-2026 at sahebnagar stores, sub division-iv, under central stores division. estimate no.est-sbn-202600067
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreProposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreConstruction of p.c.c. road from the house of prafulla roy to the house of jogesh roy
Construction of p.c.c. road from the house of prafulla roy&#x0d to the house of jogesh roy
Read moreof your Industry type