Tender Details
Particulars | Details |
---|---|
Title |
Store Fabrication In Machine Hall Tunnel For Storing Of Material Of Power House Bhep I
|
Description |
Store Fabrication In Machine Hall Tunnel For Storing Of Material Of Power House Bhep I
|
Organisation | JKSPDC | State Govt. and UT |
Tender Id | 2025_SPDC_269771_1 |
Reference Number |
33/BHEP-I of 2024-25 date 07-01-2025 |
Tender Fee | 1000 |
EMD | 19000 |
Tender Value | |
Place | BHEP-I Chanderkote |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=833127 |
Start Date | January 16, 2025 14:30 |
End Date |
28/01/2025 ( Expired 130 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreTariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Tariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Read moreTerm contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Read moreTerm contract for artificer work in technical area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in technical area of age b/r - i under ge (af) lohegaon
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreConsultancy services for provn of furniture store accommodation (210 sqm) at inaz village, veraval under ge (i) cg porbandar
Consultancy services for provn of furniture store accommodation (210 sqm) at inaz village, veraval under ge (i) cg porbandar
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreIe services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read moreof your Industry type