Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Painting Of Play Area In Between Pier P8 L P9 L P8 R P10 R Under The 2nd Bridge Over Kestopur Canal At Thakdary Mouza Newtown Kolkata
|
Organisation | WB HIDCO LTD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 12270 |
Tender Value | |
Place | Newtown, Kolkata. |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 16:30 |
End Date |
30/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreConstruction of bridge at saraipani near raghunath
Construction of bridge at saraipani near raghunath&#x0d house in ward no. 01 under nagar parishad&#x0d nowrozabad.
Read moreConstruction of bridge at turratola in ward no. 01 under nagar parishad nowrozabad.
Construction of bridge at turratola in ward no. 01 under nagar parishad nowrozabad.
Read moreof your Industry type