Tender Details

Particulars Details
Title
(1) Dismantling Of Broken Shaft And New Shaft Making As Per Broken Shaft And Motor Housing Broken Bolt Over Size Drilling And Rotor And End Cover Fitting Of 150 Hp Induction Motor Sl.No.86/83/115. (2) Dismantling Of Broken Shaft And New Shaft Making
Description
(1) Dismantling Of Broken Shaft And New Shaft Making As Per Broken Shaft And Motor Housing Broken Bolt Over Size Drilling And Rotor And End Cover Fitting Of 150 Hp Induction Motor Sl.No.86/83/115. (2) Dismantling Of Broken Shaft And New Shaft Making
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_322062_1
Reference
Number
BCCL/KA-IV/ENM/E-TEN/24-25/163 DATE-26.11.2024
Tender Fee 0
EMD 3500
Tender Value
Place AKWMC KATRAS AREA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333837
Start Date November 27, 2024 14:30
End Date

11/12/2024 ( Expired 184 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
(1) complete rewinding of one no.of induction motor 25 hp,550 volt,1460 rpm, sl no.58/a-4/387,make kirloskar at salanpur colliery(2) complete rewinding of 150 hp motor,volts 550,rpm,1440 make gec an front and rear

(1) complete rewinding of &#x0d one no.of induction motor &#x0d 25 hp,550 volt,1460 rpm, sl &#x0d no.58/a-4/387,make&#x0d kirloskar at salanpur &#x0d colliery(2) &#x0d complete &#x0d rewinding of 150 hp &#x0d motor,volts 550,rpm,1440 &#x0d make gec an front and rear

Read more
Complete repairing and rewinding and making new shaft of 400 kw, 3.3 kv, 1480 rpm marathon electric make 3 phase squirrel cage type induction ht pump-motor of patmohana colliery under sodepur area. (m/c no.- 3ff331269/4)

Complete repairing and rewinding and making new shaft of 400 kw, 3.3 kv, 1480 rpm marathon electric make 3 phase squirrel cage type induction ht pump-motor of patmohana colliery under sodepur area. (m/c no.- 3ff331269/4)

Read more
Changing of upper and lower (both side) damaged radius arm eye housing and new bushing fitting and welding of broken mounting eye and repairing of output shaft of dumper assembly opening, drive line opening and dumper assembly dismantling of 10327

Changing of upper and lower (both side) damaged radius arm eye housing and new bushing fitting and welding of broken mounting eye and repairing of output shaft of dumper assembly opening, drive line opening and dumper assembly dismantling of 10327

Read more
(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an

(1) making of 04 nos. of &#x0d motor dala end cover and &#x0d 04 nos.bearing grease cap &#x0d of at akwmc for 150hp and &#x0d 167 hp.(2) fabrication of &#x0d base plate h.t pump motor &#x0d to be installed at ocp &#x0d pump.(3) dismantling of &#x0d 3000 gpm pump flow more an

Read more
Dismantling and of track chain, roller (06) nos., idler opening, fitting and hick changing, broken bolt removal, thread making, 04 nos. quad and 02 nos. feed sprocket repairing of idm30 drill sl. no. dr-228 at nichitpur ocp sijua area

Dismantling and fitti of track chain, roller (06) nos. idler opening, fitting and hick changing, broken bolt removal, thread making, 04 nos. quad and 02 nos. feed sprocket repairing of idm30 drill sl. no. dr-228 at nichitpur ocp sijua area

Read more
Repairing/making of motor end cover (de and nde) for (a)125 kw induction motor,415 volt, 970-rpm (b) 20 kw induction motor, 415 volt, 725-rpm and new making of 63 kw, 22 kw, 18.5 kw, 15 kw, 55 kw and 125 kw motor fan materials aluminum at kathara was

Repairing/making of motor end cover (de and nde) for (a)125 kw induction motor,415 volt, 970-rpm (b) 20 kw induction motor, 415 volt, 725-rpm and new making of 63 kw, 22 kw, 18.5 kw, 15 kw, 55 kw and 125 kw motor fan materials aluminum at kathara was

Read more
Drilling of 150 mm and 115 mm dia new borewell installation of im-2 hand pump and construction of plaform as per unicef desing in various schemes as jalna dist.rural areas

Drilling of 150 mm and 115 mm dia new borewell installation of im-2 hand pump and construction of plaform as per unicef desing in various schemes as jalna dist.rural areas

Read more
Repairing/making of end cover ( de and nde) for 110kw and 76kw, 3 phase, 415 volts sq. cage induction motor of electrical section at sawang washery.

Repairing/making of end cover ( de and nde) for 110kw and 76kw, 3 phase, 415 volts sq. cage induction motor of electrical section at sawang washery.

Read more
Following repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).

Following repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).&#x0d (ii)repairing of broken and damaged 02 nos. blade arm dismantling

Read more
Repairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.

Repairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise