Tender Details
Particulars | Details |
---|---|
Title |
(1) Dismantling Of Broken Shaft And New Shaft Making As Per Broken Shaft And Motor Housing Broken Bolt Over Size Drilling And Rotor And End Cover Fitting Of 150 Hp Induction Motor Sl.No.86/83/115. (2) Dismantling Of Broken Shaft And New Shaft Making
|
Description |
(1) Dismantling Of Broken Shaft And New Shaft Making As Per Broken Shaft And Motor Housing Broken Bolt Over Size Drilling And Rotor And End Cover Fitting Of 150 Hp Induction Motor Sl.No.86/83/115. (2) Dismantling Of Broken Shaft And New Shaft Making
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_322062_1 |
Reference Number |
BCCL/KA-IV/ENM/E-TEN/24-25/163 DATE-26.11.2024 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | AKWMC KATRAS AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333837 |
Start Date | November 27, 2024 14:30 |
End Date |
11/12/2024 ( Expired 153 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing/making of motor end cover (de and nde) for (a)125 kw induction motor,415 volt, 970-rpm (b) 20 kw induction motor, 415 volt, 725-rpm and new making of 63 kw, 22 kw, 18.5 kw, 15 kw, 55 kw and 125 kw motor fan materials aluminum at kathara was
Repairing/making of motor end cover (de and nde) for (a)125 kw induction motor,415 volt, 970-rpm (b) 20 kw induction motor, 415 volt, 725-rpm and new making of 63 kw, 22 kw, 18.5 kw, 15 kw, 55 kw and 125 kw motor fan materials aluminum at kathara was
Read moreDrilling of 150 mm and 115 mm dia new borewell installation of im-2 hand pump and construction of plaform as per unicef desing in various schemes as jalna dist.rural areas
Drilling of 150 mm and 115 mm dia new borewell installation of im-2 hand pump and construction of plaform as per unicef desing in various schemes as jalna dist.rural areas
Read moreRepairing/making of end cover ( de and nde) for 110kw and 76kw, 3 phase, 415 volts sq. cage induction motor of electrical section at sawang washery.
Repairing/making of end cover ( de and nde) for 110kw and 76kw, 3 phase, 415 volts sq. cage induction motor of electrical section at sawang washery.
Read moreFollowing repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).
Following repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).
 (ii)repairing of broken and damaged 02 nos. blade arm dismantling
Read moreRepairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.
Repairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.
Read moreRepairing of both side brace assly, head cap hole making, 03 broken bolt remove thread making, cap and bushing fitment both side idler shaft broken pieces welding machining track chain cutting fitting welding of dozer-11971 in r/o akkocp
Repairing of both side brace assly, head cap hole making, 03 broken bolt remove thread making, cap and bushing fitment both side idler shaft broken pieces welding machining track chain cutting fitting welding of dozer-11971 in r/o akkocp
Read moreChanging of upper and lower (both side) damaged radius arm eye housing and new bushing fitting, and welding of broken mounting eye and repairing of output shaft of dumper assembly opening, drive line opening and dumper assembly dismantling of 10292
Changing of upper and lower (both side) damaged radius arm eye housing and new bushing fitting, and welding of broken mounting eye and repairing of output shaft of dumper assembly opening, drive line opening and dumper assembly dismantling of 10292
Read more(1) taking down 150 hp hauling motor lowering and fitting from w/shop to 2 seam u/g and 2 nd less haulage rope changing,90 hp motor,240 sq.mm cable get end box shifting at 2 seam inclin u/g keshalpur colliery
(1) taking down 150 hp 
 hauling motor lowering 
 and fitting from w/shop 
 to 2 seam u/g and 2 nd less 
 haulage rope changing,90 
 hp motor,240 sq.mm cable 
 get end box shifting at 2 
 seam inclin u/g keshalpur 
 colliery
Read moreMaking and fitting of 4 nos. end cover and bearing housing for 150kw induction motors of moonidih workshop. sl.no.mnd/cws/150kw/01, mnd/cws/150kw/03 mnd/cws/150kw/03a and mnd/cws/150kw/05
Making and fitting of 4 nos. 
 end cover and bearing 
 housing for 150kw 
 induction motors of 
 moonidih workshop. 
 sl.no.mnd/cws/150kw/01, 
 mnd/cws/150kw/03 
 mnd/cws/150kw/03a and 
 mnd/cws/150kw/05
Read moreSet of bolts for fixing bearing bracket and bearing cover pe & ce end for hs 15250 tm. one consisting of (1)hex head bolt size-m24x50 qty- 06 nos. as per is-1364, grade-8.8 (2)hex head bolt size-m16x45 qty-08 nos. as per is-1364, grade 8.8 (3)hex head bolt size-m 16x40 qty-03 nos. as per is-1364, grade-8.8(4)hex head bolt size-m20x70 qty-06 no. as per is-1364, grade-8.8(5)spring washer ,size-a24, qty-06 nos. as per is-3063. phosphated. (6)spring washer,size a16, qty-11 nos. as per is-3063.
For complete deion and other details, please refer to tender
Read moreof your Industry type