Tender Details
Particulars | Details |
---|---|
Title |
(1) Dismantling Of Broken Shaft And New Shaft Making As Per Broken Shaft And Motor Housing Broken Bolt Over Size Drilling And Rotor And End Cover Fitting Of 150 Hp Induction Motor Sl.No.86/83/115. (2) Dismantling Of Broken Shaft And New Shaft Making
|
Description |
(1) Dismantling Of Broken Shaft And New Shaft Making As Per Broken Shaft And Motor Housing Broken Bolt Over Size Drilling And Rotor And End Cover Fitting Of 150 Hp Induction Motor Sl.No.86/83/115. (2) Dismantling Of Broken Shaft And New Shaft Making
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_322062_1 |
Reference Number |
BCCL/KA-IV/ENM/E-TEN/24-25/163 DATE-26.11.2024 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | AKWMC KATRAS AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333837 |
Start Date | November 27, 2024 14:30 |
End Date |
11/12/2024 ( Expired 184 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(1) complete rewinding of one no.of induction motor 25 hp,550 volt,1460 rpm, sl no.58/a-4/387,make kirloskar at salanpur colliery(2) complete rewinding of 150 hp motor,volts 550,rpm,1440 make gec an front and rear
(1) complete rewinding of 
 one no.of induction motor 
 25 hp,550 volt,1460 rpm, sl 
 no.58/a-4/387,make
 kirloskar at salanpur 
 colliery(2) 
 complete 
 rewinding of 150 hp 
 motor,volts 550,rpm,1440 
 make gec an front and rear
Read moreComplete repairing and rewinding and making new shaft of 400 kw, 3.3 kv, 1480 rpm marathon electric make 3 phase squirrel cage type induction ht pump-motor of patmohana colliery under sodepur area. (m/c no.- 3ff331269/4)
Complete repairing and rewinding and making new shaft of 400 kw, 3.3 kv, 1480 rpm marathon electric make 3 phase squirrel cage type induction ht pump-motor of patmohana colliery under sodepur area. (m/c no.- 3ff331269/4)
Read moreChanging of upper and lower (both side) damaged radius arm eye housing and new bushing fitting and welding of broken mounting eye and repairing of output shaft of dumper assembly opening, drive line opening and dumper assembly dismantling of 10327
Changing of upper and lower (both side) damaged radius arm eye housing and new bushing fitting and welding of broken mounting eye and repairing of output shaft of dumper assembly opening, drive line opening and dumper assembly dismantling of 10327
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreDismantling and of track chain, roller (06) nos., idler opening, fitting and hick changing, broken bolt removal, thread making, 04 nos. quad and 02 nos. feed sprocket repairing of idm30 drill sl. no. dr-228 at nichitpur ocp sijua area
Dismantling and fitti of track chain, roller (06) nos. idler opening, fitting and hick changing, broken bolt removal, thread making, 04 nos. quad and 02 nos. feed sprocket repairing of idm30 drill sl. no. dr-228 at nichitpur ocp sijua area
Read moreRepairing/making of motor end cover (de and nde) for (a)125 kw induction motor,415 volt, 970-rpm (b) 20 kw induction motor, 415 volt, 725-rpm and new making of 63 kw, 22 kw, 18.5 kw, 15 kw, 55 kw and 125 kw motor fan materials aluminum at kathara was
Repairing/making of motor end cover (de and nde) for (a)125 kw induction motor,415 volt, 970-rpm (b) 20 kw induction motor, 415 volt, 725-rpm and new making of 63 kw, 22 kw, 18.5 kw, 15 kw, 55 kw and 125 kw motor fan materials aluminum at kathara was
Read moreDrilling of 150 mm and 115 mm dia new borewell installation of im-2 hand pump and construction of plaform as per unicef desing in various schemes as jalna dist.rural areas
Drilling of 150 mm and 115 mm dia new borewell installation of im-2 hand pump and construction of plaform as per unicef desing in various schemes as jalna dist.rural areas
Read moreRepairing/making of end cover ( de and nde) for 110kw and 76kw, 3 phase, 415 volts sq. cage induction motor of electrical section at sawang washery.
Repairing/making of end cover ( de and nde) for 110kw and 76kw, 3 phase, 415 volts sq. cage induction motor of electrical section at sawang washery.
Read moreFollowing repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).
Following repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).
 (ii)repairing of broken and damaged 02 nos. blade arm dismantling
Read moreRepairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.
Repairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.
Read moreof your Industry type