Tender Details
Particulars | Details |
---|---|
Title |
Withdrawing Of Damaged Rotor Shaft From Crusher Roll With Dismantling Of Hollow Shaft, Bearing Block, Fabrication Of Rotor Shaft And Worn Out Side Plate And Fitting Of Fabricated Rotor Shaft Into The Crusher Roll Of Elecon Fb No. 02 Under Kdh Ocp
|
Description |
Withdrawing Of Damaged Rotor Shaft From Crusher Roll With Dismantling Of Hollow Shaft, Bearing Block, Fabrication Of Rotor Shaft And Worn Out Side Plate And Fitting Of Fabricated Rotor Shaft Into The Crusher Roll Of Elecon Fb No. 02 Under Kdh Ocp
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_327419_1 |
Reference Number |
GM (NK)/EnM/e-NIT/2024-25/ 214 |
Tender Fee | 0 |
EMD | 6200 |
Tender Value | |
Place | KDH OCP, NK Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339367 |
Start Date | February 01, 2025 16:30 |
End Date |
11/02/2025 ( Expired 94 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling and withdrawal of old and damaged mother(impact) plate and fabrication and fitting mother(impact) plate at feeder breaker no-1 of kessurgarh abocp mine under block -ii area
Dismantling and withdrawal of old and damaged mother(impact) plate and fabrication and fitting mother(impact) plate at feeder breaker no-1 of kessurgarh abocp mine under block -ii area
Read moreRepairing/fabrication with dismantling and withdrawal of old and damaged mother(impact) plate fabrication with fitting of new mother (impact) plate and other related jobs of atlas copco make feeder breaker at dbocp.
Repairing/fabrication with dismantling and withdrawal of old and damaged mother(impact) plate fabrication with fitting of new mother (impact) plate and other related jobs of atlas copco make feeder breaker at dbocp.
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure ( cd) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure c and d after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( ab) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( a and b) after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read moreRemoval of failed bearing worn out hub-coupling of pinion side and brake hub from failed armature shaft of drag motor and fitment of new bearing, hub coupling of pinion side and brake hub in repaired armature shaft of drag motor of 7820 dragline.
Removal of failed bearing worn out hub-coupling of pinion side and brake hub from failed armature shaft of drag motor and fitment of new bearing, hub coupling of pinion side and brake hub in repaired armature shaft of drag motor of 7820 dragline.
Read moreRepairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Repairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Read moreComprehensive job of dismantling of 250 mm girder, cutting, welding, painting, fabrication of pump platform, delivery bend and suction bend for 02 nos. 2000 gpm pump at kdh ocp under nk area
Comprehensive job of dismantling of 250 mm girder, cutting, welding, painting, fabrication of pump platform, delivery bend and suction bend for 02 nos. 2000 gpm pump at kdh ocp under nk area
Read moreRepairing of drive shaft bearing bunker of rock breaker and worn out sleeve check nut of crusher drum f/b at kessurgarh siding under abocp of block-ii area
Repairing of drive shaft bearing bunker of rock breaker and worn out sleeve check nut of crusher drum f/b at kessurgarh siding under abocp of block-ii area
Read moreRepairing of travel reducer gear box output shaft, bearing damaged bearing taking out housing and new bearing press fitting and assembling of gear box of ekg shovel hmb 543/s-383 of kuya ocpbastacolla area-ix.
Repairing of travel reducer gear box output shaft,
 bearing damaged bearing taking out housing and new bearing press fitting and assembling of gear box of ekg shovel hmb 543/s-383 of kuya ocpbastacolla area-ix.
Read moreFabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery
Fabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery
Read moreof your Industry type