Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Revival Of Girliput Ii L.I.Project Under Koraput Block Of Koraput District
|
| Description |
Revival Of Girliput Ii L.I.Project Under Koraput Block Of Koraput District
|
| Organisation | Government of Odisha |
| Tender Id | 2023_OLIC_92867_27 |
|
Reference Number |
02/2023-24 |
| Tender Fee | 6000 |
| EMD | 12249 |
| Tender Value | |
| Place | L I Division Koraput |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | August 25, 2023 15:30 |
| End Date |
Expired
05/09/2023
Expired 1050 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota
Widening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreAugmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)
Augmentation of dry fly ash
 transportation system
 at
 barauni thermal power station, stage-ii
 (2x250 mw)
Read moreWork of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreProvision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Read moreAnnual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Read moreMaintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based
 maintenance contract in the state of uttar pradesh.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreof your Industry type