Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nit04/Kgp/2023 2024
|
| Description |
Construction Of 8 Nos Modified Community Leacht Pit With Silt Chamber For Imis Mouza
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_564495_4 |
|
Reference Number |
NIT04/KGP/2023-2024 |
| Tender Fee | 1500 |
| EMD | 6910 |
| Tender Value | |
| Place | KALYANI GRAM PANCHAYAT |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 07, 2023 19:20 |
| End Date |
Expired
22/09/2023
Expired 1004 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sitc of 1 nos 2.0 tr 5 star inverter split ac units and allied electrical works for chamber of ddpo(delivery) at gpo kolkata.
Sitc of 1 nos 2.0 tr 5 star inverter split ac units and allied electrical works for chamber of ddpo(delivery) at gpo kolkata.
Read moreConstruction of bir raghab moran and others (8 nos) statues and memorial park at gelapukhuri, tinsukia (phase ii) (rsl 22)
Construction of bir raghab moran and others (8 nos) statues and memorial park at gelapukhuri, tinsukia (phase ii) (rsl 22)
Read moreConstruction of civil foundation 2 nos. 33 kv feeder bay for m/s prinjal renewable energy along with ext. of control room building at 132 kv gss momasar
Construction of civil foundation 2 nos. 33 kv feeder bay for m/s prinjal renewable energy along with ext. of control room building at 132 kv gss momasar
Read moreProcurement of 2 nos. tractors with pto driven pump sets for e and m department under rohini zone
Procurement of 2 nos. tractors with pto driven pump sets for e and m department under rohini zone
Read moreConstruction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Read moreCharter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Charter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Read moreConstruction of community shed fabricated at jagti near jagdamba mandir, ward no.2, pyt. jagti, block nagrota under scheme mplads for the year 2025 26 2nd call
Construction of community shed fabricated at jagti near jagdamba mandir, ward no.2, pyt. jagti, block nagrota under scheme mplads for the year 2025 26 2nd call &#x0d
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreComp. amc of 4 nos otis lift 1 no 14 passenger capacity, 3 no 10 passenger capacity with ard and door sensor installed at 40 court building, civil court, ranchi for the period of 3 years.
Comp. amc of 4 nos otis lift 1 no 14 passenger capacity, 3 no 10 passenger capacity with ard and door sensor installed at 40 court building, civil court, ranchi for the period of 3 years.
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired
Read moreof your Industry type