Tender Details

Particulars Details
Title
Provision Of Hard Standing 1,Provision Of Hard Standing 2,Provision Of Hard Standing 3,Provision Of
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/4758576
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date March 09, 2024 20:36
End Date
Expired 20/03/2024

Expired 935 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: cancelled
Additional Information: Average Turn Over of Last 3 Years: 24 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army
Similar Tenders
Supply of hard facing welding electrodes

Supply of hard facing welding electrodes

Read more
Tender for provision of diet to inpatients, duty doctors

Tender for provision of diet to inpatients, duty doctors

Read more
Provision of various types of fan at smqs at air force station kalaikunda under ge project af kalaikunda

Provision of various types of fan at smqs at air force station kalaikunda under ge project af kalaikunda

Read more
Emd service charges for provision and arrangement of silica gel breathers for all 11kv 3.3kv segregated phase bus ducts

Emd service charges for provision and arrangement of silica gel breathers for all 11kv 3.3kv segregated phase bus ducts

Read more
Improvement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit

Improvement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit

Read more
Provision of linear led lighting and allied works at 14 a site retail outlets under tirur rsa and kozhikode west rsa, kozhikode divisional office 11 ros of tirur rsa 3 ros of kozhikode west rsa

Provision of linear led lighting and allied works at 14 a site retail outlets under tirur rsa and kozhikode west rsa, kozhikode divisional office 11 ros of tirur rsa 3 ros of kozhikode west rsa

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Work related to the chhath festival within the lakhisarai municipal council area, comprising the cleaning of 43 (forty-three) chhath ghats, installation of temporary bamboo barricading, laying of walkways and sand, and the provision of changing rooms, access paths to the ghats, watchtowers, and decorative cloth installations for beautification.

Work related to the chhath festival within the lakhisarai municipal council area, comprising the cleaning of 43 (forty-three) chhath ghats, installation of temporary bamboo barricading, laying of walkways and sand, and the provision of changing rooms, access paths to the ghats, watchtowers, and decorative cloth installations for beautification.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise