Tender Details

Particulars Details
Title
C Leaning And Hot Iron Work
Description
Ar Work For Dry Clean Washing Hot Iron Of Bed Sheet And Pillow Covers Of Various Blocks At Mla Rest House Bhopal
Organisation Capital Project Administration | State Govt. and UT
Tender Id 2026_CPA_496862_1
Reference
Number
05/SAC/DT 1.4.2026
Tender Fee 2295
EMD 18741
Tender Value -
Place BHOPAL
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=602179

Start Date April 13, 2026 23:30
End Date
Expired 22/04/2026

Expired 172 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.

Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.

Read more
Supply of control damper assembly for mill hot primary air of unit-xi boiler

Supply of control damper assembly for mill hot primary air of unit-xi boiler

Read more
Providing iron sheeting at singareni ground (beside fire office) in yellandu in bhadradri kothagudem district

Providing iron sheeting at singareni ground (beside fire office) in yellandu in bhadradri kothagudem district

Read more
Tggenco-ktps vii stage/paloncha - supply of iron analyzer for 6 samples in swas room

Tggenco-ktps vii stage/paloncha - supply of iron analyzer for 6 samples in swas room

Read more
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Read more
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Read more
Providing chairs,tables, carpets, iron mesh barrication, painting and cleaning of cherlapally baby pond in ward 17-cherlapally in view of bathukamma festival 2026 of kapra circle-07, uppal zone, mmc.(rs.2.20 lakhs)

Providing chairs,tables, carpets, iron mesh barrication, painting and cleaning of cherlapally baby pond in ward 17-cherlapally in view of bathukamma festival 2026 of kapra circle-07, uppal zone, mmc.(rs.2.20 lakhs)

Read more
Arrangement of stage with green carpet, side walls, decoration of stage etc including cost and conveyance of iron poles with stage for flooring, cloths including all material on hire basis etc., completed including scoffolding charges under municipal general fund.

Arrangement of stage with green carpet, side walls, decoration of stage etc including cost and conveyance of iron poles with stage for flooring, cloths including all material on hire basis etc., completed including scoffolding charges under municipal general fund.

Read more
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise