Tender Details

Particulars Details
Title
Plantation Of Trees On Both Sides Of The Road In Jurisdictions Of Sub Division Sudhagad Pali District Raigad Under P.W. Division Alibag Along With Maintenance And Repair For 3 Years
Description
Plantation Of Trees On Both Sides Of The Road In Jurisdictions Of Sub Division Sudhagad Pali District Raigad Under P.W. Division Alibag Along With Maintenance And Repair For 3 Years
Organisation Public Works Region | State Govt. and UT
Tender Id 2024_PWR_1105508_1
Reference
Number
Notice No.33 for 2024-25/ AD/Tender/ 5196/2024/2
Tender Fee 1090
EMD 37000
Tender Value
Place Sudhagad Pali
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1930376
Start Date October 05, 2024 14:30
End Date

10/10/2024 ( Expired 270 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening

Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Special repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.

Special repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.

Read more
Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) shamchurasi constituency (one year defect liability period plus 4 years maintenance of road) group no. 3

Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) shamchurasi constituency (one year defect liability period plus 4 years maintenance of road) group no. 3

Read more
Fdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.

Fdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.

Read more
Supply of good quality paddle wheel aerator with 170 cc diesel engine set

Supply of good quality paddle wheel aerator with 170 cc diesel engine set in different blocks under contai andegra sub division of purba medinipur district under the scheme monoculture of vannamei shrimp under smy during 20

Read more
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar

Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise